Council archive · source document
Development Application IDAS Forms 1, 6 & 4 Ecological Assessment, Plans · OPW12/0257
Plans and drawings: the text below has words only, no drawings.
Very large file (59.8 MB): may take a few minutes to open.
ODD
8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or inte ering with subartesian water (other than using a water truck to
pump water)?
I~NO I.
Go to question 8.14
DYes
8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for inte ering with overland flow water (other than using a water truck to pump
water)?
I~NO I.
Go to question 8.19
DYes
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply (Safety
DYes ~ No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent DYes ~ No
. If yes to any of the above you must complete Referable dam /DAS form 16.
-
. This application requires assessment by the Department of Environment and Resource Management
(DERM).If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
Section reference:
. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
. Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
. Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
. Water Act 2000, section 966A and 9668 (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
. Wild Rivers Act 2005, section 43A
. Wild Rivers Code (note:this code does not currently contain applicable provision for taking or interfering with
artesian water)
. Relevant wild river declarations
Notes for completing this form:
.
Applicant details /DAS form 1 and Development application assessment /DAS checklist 1 must be
- -
completed for all development applications to be considered.
. The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
Privacy -
please refer to the assessment manager for further details on the use of information recorded in
this form.
Disclaimer:
While the Department of Infrastructure and Planning (DIP)believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.
Operational works -
IDAS checklist 4
Version 1.0 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application IDAS Forms 1, 6 & 4 Ecological Assessment, PlansRelated documentApplication case desk ↗
About this file
- File size
- 59.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.