Figure 1 – Swept Path of a B99 vehicle entering and passing on the driveway
Action:
2c. A cross section of the driveway/pedestrian path that includes any necessary
measure to provide a safe pedestrian environment
RESPONSE 2c
The driveway has included a pedestrian path to safely allow access to the rear units, as
shown in Figure 2. The path will be textured with a difference pavement treatment to
provide a visual cue for drivers. Given the low traffic volumes, low speed environment and
straight alignment of the driveway, the proposed pathway is considered acceptable. It is
recommended suitable connection from the driveway to the existing footpath (as shown in
Photograph 1) on Toolar Street be provided.
Figure 2 – Pedestrian Access
Hayes Traffic Engineering ABN 98 615 073 565
211083 Toolar Street RFI Page 2 of 4
[OCR of page images]
Figure 1 — Swept Path of a B99 vehicle entering and passing on the driveway
Action:
2c. A cross section of the driveway/pedestrian path that includes any necessary
measure to provide a safe pedestrian environment
RESPONSE 2c
The driveway has included a pedestrian path to safely allow access to the rear units, as
shown in Figure 2. The path will be textured with a difference pavement treatment to
provide a visual cue for drivers. Given the low traffic volumes, low speed environment and
straight alignment of the driveway, the proposed pathway is considered acceptable. It is
recommended suitable connection from the driveway to the existing footpath (as shown in
Photograph 1) on Toolar Street be provided.
Figure 2 — Pedestrian Access
DRIVEWAY
=¢
2
“Fy
7
I
|
L
Hayes Traffic Engineering ABN 98 615 073 565
211083 Toolar Street RFI Page 2 of 4
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 3.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.