Original source · versioned page text
Attachment 3.pdf
Photograph 1 – Footpath on Toolar Street east and west of Driveway
Action:
2d. A fully dimensioned plan of the car parking and manoeuvering areas.
2e. Vehicle manoeuvering plans for each space.
RESPONSE 2d and e
Please refer to the attached plan provided by Robin Spencer Architects. Swept paths have
been provided for a B99 vehicle accessing the visitor parking spaces and entering and exiting
the site in forward gear with only one reverse manoeuver.
Figure 3 – B99 Swept Path for Visitor Spaces
Hayes Traffic Engineering ABN 98 615 073 565
211083 Toolar Street RFI Page 3 of 4
[OCR of page images]
Photograph 1 — Footpath on Toolar Street east and west of Driveway
Xa io
Action:
2d. —_ A fully dimensioned plan of the car parking and manoeuvering areas.
2e. Vehicle manoeuvering plans for each space.
RESPONSE 2d and e
Please refer to the attached plan provided by Robin Spencer Architects. Swept paths have
been provided for a B99 vehicle accessing the visitor parking spaces and entering and exiting
the site in forward gear with only one reverse manoeuver.
Figure 3 — B99 Swept Path for Visitor Spaces
ae ge
Hayes Traffic Engineering
ABN 98 615 073 565
211083 Toolar Street RFI
Page 3 of 4
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 3.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.