Council archive · source document
20517 App P.pdf [As Published] · 132007.1259
Catchpole Building Services: compliance~assess~table~perigian Residential precinct The roof needs to be non-combustible. The fire stairs if connecting three storeys needs to be fir isolated and fire rated from the balance of the building. The lid of the fire isolated Stairs needs to be fire rated i laccordance with clause 2.7 of Specification C1.1 of the BC lat the same rating as the walls of the stair shaft. The floor between the class 7a sprinklered enclosed carpar land the class 5/6 portion above needs to be 120/120/120 FRL Walls erected on the boundary are to be fire walls. Table 3 of Specification C1.1 INil FRL’s for floor laid directly on the ground. All External loadbearing walls attract a FRL |All external loadbearing columns < 3 m from a FSF attract FRL |All Loadbearing (LB) internal walls attract a 90/90/90 FRL Internal (NLB) walls bounding lift and stair shafts attract -/90/90 FRL Internal NLB walls bounding SOU’s attract -/60/60 FRL Internal (NLB) walls Bounding public corridors and the lik attract -/60/60 FRL LB Walls bounding shafts attract 90/90/90 FRL NLB wall attract -/60/60 FRL. Floors attract 90/90/90 FRL B Walls bounding — th SOU’s are to be 90/90/90 IFRL. In addition th onfiguration of the units llows for sub tenancies from ime to time. These areas ill also need to be treated as alls bounding a SOU. Mark CATCHPOLE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App P.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.