Council archive · source document
20517 App P.pdf [As Published] · 132007.1259
Catchpole Building Services:
compliance~assess~table~perigian
ae etc. f
Energy Efficiency
Applicable
he provisions of Part J will apply to the building.
The class 3 portion of the building is a conditioned space.
he class 5/6 portions of the building are also required to be designed to be a conditione
pace.
The class 7a carpark portions are not conditioned spaces.
Part J1, J2, J3, J4, J5, J6, J7 and J8 apply.
Ensure methods of compliance are documented on plans together with appropriate competen
erson certification.
1: Generally:
Roof / ceiling to conditioned space requires R3.2
Walls to the conditioned space require compliance with clause J1.5 and Table J1.5b option
(d)
2: Generally
dentify which glazing method to be used.
dentify the aggregate glazing conductance and solar heat gain limits
Identify what extent of shading is required.
3: Generally
Identify the means of compliance of building sealing to the conditioned space.
4: Generally
dentify the building air movement to those areas not being served by Air Handling systems|
o Part F4 and J5 requirements.
5: Generally
Mark CATCHPOLE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App P.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.