Council archive · source document
20517 App P.pdf [As Published] · 132007.1259
Catchpole Building Services: compliance~assess~table~perigian Demonstrate hours of operation of the system design for mechanical ventilation and ai andling systems. [Demonstrate the extent of insulation of ductwork Limit reheating and Not mixing heated with cooled air. [Time switching is to be demonstrated in accordance with J5.3 Heating and chilling systems are to demonstrate compliance with J5.4 Workshop exhaust needs to be clarified if considered a miscellaneous exhaust system for the urposes of part J. 6: Generally Identify the w/m? for each use and space. These would be best shown on a table on the plans Identify on the plans the methods of complying with Clause J6.3 artificial lighting and powe control. Demonstrate interior and decorative lighting complies with J6.4 Demonstrate compliance with exterior lighting to J6.5 Demonstrate compliance of boiling water and chilled water services with J6.6 7: Generally emonstrate Hot water supply complies with J7.2 8: Generally: emonstrate accessibility for maintenance for plant , equipment and components that require} aintenance in accordance with Part I2 Mark CATCHPOLE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App P.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.