Original source · versioned page text
SPCE05212613 Permit
Attached to the e-mail DEHP conditions MCU12/0216.
EHP Permit number: SPCE05212613 Schedule C - Land Land Rehabilitation c1 c2 C3 The site (including all disturbed areas such as slopes, borrow pits, stockpile and screening areas) must be rehabilitated in a manner such that: (a) suitable species of vegetation (native species where practicable) are planted and established or such that the land is returned to a use suitable for the area; (b) weed species of vegetation are removed; (c) potential for erosion of the site is minimised; (d) the quality of stormwater, other water and seepage released from the site is such that releases of contaminants such as suspended solids, turbidity, total dissolved salts, pH, total iron, total aluminium, and total manganese are not likely to cause environmental harm; (e) the likelihood of environmental nuisance being caused by release of dust is minimised; (f) the water quality of any residual water body meets relevant criteria for subsequent uses and does not have potential to cause environmental harm; (g) the final landform is stable and not subject to slumping; and (h) any actual and potential acid sulfate soils in or on the site are either not disturbed, or are submerged or treated, so as to not be likely to cause environmental harm. Rehabilitation of disturbed areas must take place progressively as works are staged and new areas of extraction are commenced. Rehabilitation works must take place as soon as practicable after extraction works are completed. Preventing Contaminant Release to Land C4 C5 C6 C7 C8 cg C10 Contaminants other than settled / treated stormwater from the stormwater collection system must not be released to land. Refuelling, washing, degreasing, servicing, cleaning or other maintenance of vehicles, equipment or plant must be carried out in designated areas where contaminants cannot be released to any waters, roadside gutter or stormwater drainage system. Spillage of all chemicals and fuels must be contained within an on-site containment system and controlled in a manner that prevents environmental harm. All petroleum product storage must be designed, constructed and maintained in accordance with AS 1940 - Storage and Handling of Flammable and Combustible Liquids. Any spillage of wastes, contaminants or other materials must be cleaned up as quickly as practicable. Such spillages must not be cleaned up by hosing, sweeping or otherwise releasing such wastes, contaminants or material to any stormwater drainage system, roadside gutter or waters. The base and walls of all hydrocarbon and chemical storage bunds must be maintained free from gaps or cracks. All hydrocarbon and chemical storage bunds must be roofed where practicable. Where it is impractical to completely roof a bunded area, the registered operator must ensure that any stormwater captured within the bund is free from contaminants or wastes prior to any release. Y Page 5 of 9 » 120607 * Version 1 Department of Environment and Heritage Protection
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.