Original source · versioned page text
SPCE05212613 Permit
Attached to the e-mail DEHP conditions MCU12/0216.
EHP Permit number: SPCE05212613 Schedule D - Noise D1 D2 D3 Noise from the ERA must not cause an environmental nuisance at any nuisance sensitive place. When requested by the administering authority, noise monitoring must be undertaken to investigate any complaint of noise nuisance and the results are to be provided within 14 days to the administering authority. The method of measurement and reporting of noise levels must comply with the latest edition of the Queensland Government Noise Measurement Manual. Schedule E - Water E1 Erosion protection measures and sediment control measures must be implemented and maintained to minimise erosion and the release of sediment. E2 Suitable diversion drains and/or contour banks must be designed, installed and maintained to minimise the potential for stormwater runoff to enter areas disturbed by the activities. E3 Sediment basin(s) must be installed and maintained to collect and treat stormwater runoff from all disturbed areas of the approved place and areas in which any earthen material is stored. E4 Any sediment basin(s) must be designed, constructed and maintained to contain the run-off expected from a 24 hour storm event with an average recurrence interval of 1 in 10 years. E5 Any sediment basin(s) must be operated in such a manner that within 5 days of the most recent rainfall event, the required design capacity of the storage volume is available for capture and storage of stormwater runoff from the next rainfall event. E6 Contaminants other than settled or treated stormwater from the stormwater collection system must not be released to any waters (including the bed or banks of any waters). E7 Notwithstanding condition E6, settled or treated stormwater released must not have any properties nor contain any organisms or contaminants in concentrations that are capable of causing environmental harm. E8 There must be no controlled discharge of contaminated site waters to any waters, roadside gutter or stormwater drain other than in compliance with Table 1 — Water Quality Release Criteria. E9 Extraction activities must be conducted in a manner that avoids disturbance of groundwater. Table 1 — Water Quality Release Criteria Quality Release Limit Monitoring Frequency Characteristics pH 6.5 -8.0 Prior to and daily during discharge’ Total Suspended 50 mg/L Prior to and daily during Solids discharge’ : Discharge waters are to be monitored within sediment basin(s) at the point of discharge. Page 6 of 9» 120607 « Version 1 Department of Environment and Heritage Protection
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.