Council archive · source document
Annual BMP Review Report 2018-2019_May 2019 · RAL18/0023
Report on Annual Review of Bushfire Preparedness Q.I.C.
for Noosa Civic (2018-2019)
1. Introduction
The large area of land south of Eenie Creek Road know as Noosa Civic has been
developed as a multi use commercial hub.
The area south and east of the development has remained in part vegetated. A bushfire
review undertaken in 2018 recommended some additional actions while the adjoining
vegetation was retained. (see Aerial Photograph No. 1)
2. Description of Proposed Actions
The summary of proposed works is detailed below as Table 1.
TABLE 1
Summary of Proposed Works with Timing and Budget Estimate
Immediate Attention
Items Items Description Timeframe/Frequency Cost Estimate
4.1.1 Clear access track 2018/19 $12,000
from Hofmann Drive
to Walter Hay Drive
Connection ( 4
metres wide –
formed and drained)
4.1.2 Upgrade of dead 2018/19 $8,000
end track running
north from track in
4.1.1 to a loop as
shown in Aerial
Photo. 3 (4x4
standard – not
formed and drained)
4.1.4 Widening of existing 2018/19 $30,000 +
path from the south (Quotes are required
west corner of the for better estimate)
Big W building
around to the south
east corner to
provide vehicular
access from
Hofmann Drive to
north east car park
18-028 Annual Review Report 2018-2019 Commercial-in-Confidence
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Annual BMP Review Report 2018-2019_May 2019.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.