Skip to the record
Accept no substitutions.

Council archive · source document

Annual BMP Review Report 2018-2019_May 2019 · RAL18/0023

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Report on Annual Review of Bushfire Preparedness                                                          Q.I.C.
for Noosa Civic (2018-2019)


    4.2.1                     Removal of              2018/19                         $15,000+
                              understorey
                              vegetation and dead
                              end dangerous
                              trees on the
                              southern side of
                              Hofmann Drive to
                              Walter Hay Drive
                              access track as
                              mentioned in 4.1.1
                              (total width of 10m
                              including the track)
    4.2.2                     Removal of              2019/20                         $5,000
                              understorey
                              vegetation around
                              Fuel Reduction Unit
                              1 and 2 ( achieved
                              in conjunction with
                              4.1.1 and 4.1.2)
    4.3                       Provide hose and        Prior to the 2019 fire          $5,000
                              reels adjacent to       season.
                              three Urban Fire
                              Hydrants along the
                              southern wall of Big
                              W
    Sub Total                                                                         $75,000 +



                                           Subsequent Attention
    4.1.3                       Construction of        Only required if             Investigation: $1,500
                                access track from      hazard reduction             Construction: $8000 -
                                end of Hofmann         burning proves               $10,000
                                Drive around           impossible by 2020.
                                southern section of
                                the property out to
                                Walter Hay Drive
    4.2.4 Unit 1                Arrange Fuel           As soon as                   $5,000
                                Reduction Burn with    preparation work is
                                Local Rural Fire       completed.
                                Brigade                Late Winter 2019
    4.2.4 Unit 2                Arrange Fuel           2021/22                      $5,000
                                Reduction Burn with
                                Local Rural Fire
                                Brigade




  18-028 Annual Review Report 2018-2019                                        Commercial-in-Confidence
                                                                                                Page 2

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Annual BMP Review Report 2018-2019_May 2019.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.