for Noosa Civic (2018-2019)
4.3 Confirm urban water Prior to the 2019 fire TBC
supply along the season.
south-east access
driveway out of the
carpark to facilitate
connection of urban
water if need be
Area 2 Arrange fuel 2020/21 TBC
(see Plan reduction burn with
032310.10) National Park
Sub Total $19,500 – $21,500 +
Ongoing Annual Obligations
4.2.3 Removal of all Annually $4,000
understorey
vegetation out of the
edge of the bank as
is the current
practice
Annual Review Site inspection prior Annually $2,000
to September. See attached
checklist.
Sub Total $6,000
These actions included the possibility of future fuel reduction burning. The high rainfall
and lack of suitable weather confirms the difficulty associated with these activities but they
should be pursued each year as an aim.
3. Actions Completed as at May 2019
The site was inspected on 22nd May 2019 and the overall situation is vastly improved on
the 2018 position.
The site is much safer with improved access and a much better capacity for suppression if
it is required.
The details of actions and outcomes include:-
1. (4.1.1) – Access track from Hoffmann Drive to Walter Hay Drive has been cleared
to a 4 metre width. (see Photograph Nos. 1 & 2 and Access Management Plan)
18-028 Annual Review Report 2018-2019 Commercial-in-Confidence
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Annual BMP Review Report 2018-2019_May 2019.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.