‘          TOWN PLANNING REPORT                                                            -                                   Ab
        a                                                                                                                          .

                                                                                                                            ken nicks

                      Specific Outcomes                       Probable solutions                       Proposal
                                                            patrons and staff during
                                                            business hours with security
                                                            gating only activated for
                                                            Commerclal Uses outside of
                                                            business hours.

           4.3.2 Residential Uses Code
           Table 14-21 — For All Residential Uses                                                   .
                      Specific Outcomes                       Probable solutions                       Proposal

.
           Elechicity supply infrastructure                                       \                                                      .
           01 The development does not adversely      $1.1} No solution provided          Complies - The development will
           impact on existing or future electricity                                       not negatively impact on existing
           supply infrastructure;                                                         electrical infrastructure. The site is
                                                                                          not located within 50m of an
           AND                                        $2.1 Development for uses           electricity substation or under
 @                                                    adjacent to or within S0m of an     overhead electricity transmission
           O2 All uses and works maintain an          existing electricity substation     lines or within electricity easements.
           adequate safe distance from electrical     incorporates noise attenuation
           infrastructure including substations,      measures to mitigate noise                   ,
           overhead powerlines, power poles and       impacts;
           transformers.                              AND
                                                      $2.2 Buildings and structures
                                                      (including swimming pools, sheds,
 .                                                    tennis courts or outbuildings} are
                                                      not constructed under overhead
                                                      electricity transmission lines, or
                                                      within electricity easements;
                                                      AND
                                                      $2.3 A minimum separation
                                                      distance is maintained from the
                                                      electricity transmission line to the
                                                      closest boundary of habitable
                                                      buildings and child activity areas,
                                                      as follows—
                                                      a}    20m for transmission lines up
                                                            to 132kV;
                                                     b)     30m for transmission lines
                                                            between 133kV and 275kV:
 @                                                          and
  ”                                                   c)    40m for transmission lines
                                                            greater than 275kV.

           Hot Water Systems
           O3 Hot water systems are installed and     $3.1 All hot water systems installed | Complies — The building will
           operated to support the efficient use of   are—                                implement hot water systems as
           natural resources and minimise             solar systems; or                   prescribed by the applicable
           consequent pollution such as greenhouse | electric heat pump systems; or       probable solution.
           gas emissions.                             natural gas or LPG systems; or
                                                      any combination of a}, b) orc).
           Water supply and conservation                                                                                             ;
           04 On-site water storage is designed and | $4.7 Ifin a designated rainwater    Complies - The proposal is
           operated to support the efficient use of   tank area as identified in Map | of | identified in Map 1 of schedule 8 as
           water;                                     Schedule 8, residential uses that   being within a rainwater tank area,
                                                      qualify as class 1A or 1B structures A rainwater harvesting tank will be
           AND                                        under the Building Code of          provided in accordance with:
                                                      Australia have a rainwater tank or | schedule 8.
           O5 On-site water storage is adequate for   tanks in accordance with
           occupants every day use and fire fighting | Schedule 8.
           purposes.                                  AND                          .
                                                      $5.1 Where not in a water service
                                                      area a rainwater tank of a           .
                                                      minimum of 60,000 litres is
                                                      provided for each dwelling unit,

           June 2007                Material Change of Use for Retail Business Type 2 Shop & Salon and          Page 20 of 33
                                               Visitor Accommodation Type 4 Conventional
                                                    33 Hastings Street, Noosa Heads

Used in these records

About this file

File size
12.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00156B56.001.pdf · 12.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.