Rap Approval · RAP15/0034
Attached to the e-mail OPW16/0020 - Operational Works Application.
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
4. ADVISORY NOTES
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
6855.
Co-ordination of Operational Works Assessment
2. To assist Council to undertake an integrated assessment of the operational works
application, all aspects of the works must be included in one (1) application and be in
accordance with Council’s planning scheme. Additional application fees apply to
applications where the different aspects of the works are lodged separately.
Significant savings in application fees will result if all works are lodged in a single
application.
Qualified Person
3. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
5. REASONS FOR INCLUSION OF CONDITIONS
Council requires the conditions be attached to any development approval to ensure the
development complies with the outcomes of the Noosa Plan.
6. FURTHER PERMITS REQUIRED
The following further development permits are required by the conditions herein:
Development Permit for Operational Works (Earthworks & Stormwater)
7. REPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE
The applicant is entitled to make representations to Council about this referral agency
response pursuant to the Sustainable Planning Act 2009.
If the applicant wishes to make representations, the applicant may, by written notice given
to the assessment manager, for not more than 3 months, stop the decision making period at
any time before the decision is made. If a notice is given, the decision making period stops
Page 4 of 5
Document Set ID: 19997997
Version: 1, Version Date: 11/12/2015 Print Date: 11 December 2015, 11:47 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RAP APPROVAL.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.