                          Stormwater Drainage
                  10.     The site must be provided with a stormwater drainage system connecting to a lawful
                          point of discharge. The works must be undertaken in accordance with an Operational
                          Works approval and be generally in accordance with drawing number 25353-B3 dated
                          October 2015 prepared by SCG Consulting Engineers.
                  11.     All stormwater runoff from the development must be directed to Council’s drainage
                          system in Witta Circle.
                          Geotechnical Stability
                  12.     Excavation of the site and the construction of the proposed works shall not have any
                          adverse affects on the stability of adjoining buildings and/or structures and/or services
                          and/or lands. In this regard a Registered Professional Engineer Queensland shall
                          supervise the excavation of the site and the construction of the new works to
                          determine whether any additional measures are required to protect the stability of
                          adjoining buildings and/or structures and/or services and/or lands.
                  13.     The use of vibratory equipment of any kind is not permitted to be used (including
                          vibrating rollers and the use of vibrating installation techniques for sheet piling and
                          other construction vibrations caused by excavating, earthmoving or demolition
                          machinery or other similar construction techniques) unless approved and supervised
                          by a Certified Geotechnical Engineer. Under such circumstances the operator of
                          such equipment shall at all times comply with the directions of the Geotechnical
                          engineer and the reasonable and lawful directions of Council officers.
                  14.     Certification of the completed works must be provided to Council by the supervising
                          engineer. The certification shall state that the completed works conform with all
                          aspects of the design and that the completed works will not have any adverse affects
                          on the stability of adjoining buildings and/or structures and/or services and/or lands.
                          Earthworks and Retaining Walls
                  15.     All excavation works and associated retaining works must be undertaken in
                          accordance with an Operational Works approval, and contained entirely within the
                          subject site unless written permission from the respective landowner(s) is provided to
                          Council.
                  16.     Structures must be designed and constructed such that they are free standing within
                          the site and must not create any additional loads on to the existing revetment wall.
                          Acid Sulfate Soils
                  17.     As the site is located below the 5m AHD, any excavation works consisting of 100m3
                          or greater and/or any filling works consisting of 500m3 or greater and with an average
                          depth of 0.5m or greater will need to be carried out in accordance with State Planning
                          Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils and the
                          recommendations of the Acid Sulfate Soil Investigation Report Number J000154-001-
                          R-Rev0 dated November 20152 prepared by Core Consultants. In this regard
                          appropriate testing and supporting documentation prepared by a suitably qualified
                          specialist must be submitted to Council for approval prior to obtaining a Development
                          Permit for Operational Works
                          Damage to Services and Assets
                  18.     Any damage caused to existing services and assets as a result of the development
                          works must be repaired at no cost to the asset owner at the following times:




                                                                                                           Page 3 of 5


Document Set ID: 19997997
Version: 1, Version Date: 11/12/2015                                                            Print Date: 11 December 2015, 11:47 AM

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RAP APPROVAL.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.