Council archive · source document
App G - Code Tables · 132008.299.02
Noosa Plan 2020: Amendment 2
Part 9 Development codes \ 9.4 Works Codes \ 9.4.10 Waste Management Code
Development that generates several classes of waste Construction, operational and demolition works are The waste storage area servicing Dolphins
is designed so waste is collected, stored and disposed planned and managed in accordance with Planning Backpackers is:
of in a safe and ecologically sustainable manner. Scheme Policy PSP9 Waste management. • Screened from public view
Editor’s Note— PSP9 Waste Management requires Waste • Constructed on hardstand concrete
Management Plans to be prepared as part of certain types of • Bunded to contain wash-down water
development applications to ensure proper consideration is • Drained to sewer with appropriate fall
given to waste minimisation, segregation and reuse. • Large enough to manoeuvre, clean and
AO1.2 separate bins
Adequate area is provided on-site for the collection • Lit for early morning or late afternoon
and separate storage of recyclable, non-recyclable, visibility
vegetative and hazardous materials in their specific • Located away from sensitive boundaries
waste streams during construction or demolition works • Easily accessible for staff and waste
and the operational phase of development. contractors
• Open (unroofed) – this is acceptable
because:
o the area drains to sewer,
o is fully bunded,
• and stores domestic waste only, meeting
Code requirements.
A waste Management Plan is provide as Appendix
E.
PO2 AO2 Can be conditioned to comply
Waste storage areas provide for adequate separation Waste storage areas allow for the separate storage of
of all recyclable and non-recyclable materials. different waste materials for reuse or recycling by:
(a) providing sufficient area to store all recyclable
material and recycling containers; and
(b) sign posting the types of waste stored.
Table 9.4.10.3 - Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes Comments
Assessable development
Design and location
PO3 AO3.1 Complies
Print Date: 17/10/2025 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App G - Code Tables.pdfRelated documentApplication case desk ↗
About this file
- File size
- 918 KB (small file)
- File type
No other editions are linked here.