Skip to the record
Beware of cheap imitations.

Council archive · source document

Referenced Documents - MCU13 0098.01 · MCU13/0098.01

of 9

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020


[OCR of page images]
 

OPERATIONAL PHASE:

RECOMMENDATIONS FOR ESTABLISHMENT & OPERATION:

PHASE OF ESTABLISHMENT:

The first 2 Years after construction are crucial for the performance of the VBFS.

“Ensure the right plant selection (refer "Healthy Waterways" for plant selection)
**During dry periods provide sufficient watering

****Perform regular weed removal

****Replace not established plants where required

Perform routine inspections of the raingarden (VBFS) to identify any areas of obvious increased sediment deposition, scouring from
storm flows, rill erosion of the batters from lateral inflows and clogging
Perform routine inspections of the inflow systems in particular the grated drain and clean the grated drain regular from debris and litter
Perform routine inspections of the surface of the raingarden and clean from litter and gross pollutants
Remove sediment build ups in the raingarden

Repair any damage from vehicle traffic

Provide regular irrigation/watering during extended dry periods
Remove any invasive weeds at any time

Remove plants that have died and replace them

Perform regular pruning as to Landscape Architects schedule to encourage growth and healthy establishment of plants

Perform vegetation pest minotoring and control as to Landscape Architects schedule

RECOMMENDATION:

THE RAINGARDEN IS PROPOSED TO BE A STORMWATER TREATMENT DEVICE AS OPPOSED TO A NORMAL GARDEN
BED. WE RECOMMEND TO SET UP A SIGN EXPLAINING THE PURPOSE OF THE RAINGARDEN.

WIDTH AS SPECIFIED IN PLAN

VEGETATED BIO RETENTION SYSTEM LENGTH AS SPECIFIED IN PLAN

Use for mulching: LUCERN, WOODCHIP OR EQUIVALENT.

WIDTH AS SPECIFIED IN PLAN

 

 

SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTES:

 

 

 

PSP ei oT
FILTER LAYER: i
Clay 2-4% (<0.002mm) [J
silt 4-8% (0.002-0.05mm) [[||
Very Fine Sand 5-10%(0.05-0.15mm) U
Fine Sand 10-25% (0.15-0.25mm)
Med./Coarse Sand 60-70% (0.25-1.0mm) Ly

OULU I Coarse Sand 7-10%(1.0-2.0mm) HI

 

 

 

 

 

 

   
    
  
 

 

{TRANSITION LAYER:

 
 
 

 

 

| Coarse Sand 100% 0.5-2 mm
DRAINAGE LAYER:
oO CO Fine Gravel 100% 2-5 mm

 

 

 

 

 

  

Provide PVC perforated pipe with
diameter as specified in plan.
Minimum 2 off.

 

 

 

 

  

Provide base grade at 0.5

 

'% (1:200)

 

 
 
 

drainage.

   

 

 

Connect subsoil
drainage to stormwater
infrastructure as
specified in plan.

 

VEGETATED BIO FILTER STRIP SOIL SPECIFICATION

 

 

(NOT TO SCALE)

 

         
     

NOTES:
1.

2. Provide "FOREBAY’ made of rocks and pebbles. For

Provide selected plants as to specification of
"Healthy Waterways” http://www.healthywaterways.org/

scour protection. Refer detailed design for area.

MAINTENANCE PLAN

 

The maintenance of the bioretention basin elements involve:

WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FOR SOUTH EAST
QUEENSLAND (Chapter 5, Item 5.6).

Routine inspection of the bioretention basin profile to identify any areas of obvious increased sediment
deposition, scouring from storm flows, rill erosion of the batters from lateral inflows, damage to the profile

from vehicles and clogging of the bioretention basin (evident of "boggy" filter media surface).

Routine inspection of inflows systems, overflow pits and under-drains to identify and clean any areas of
scour, litter build up and blockages.
Removal of sediment where it is smothering the bioretention basin vegetation.

Where a sediment forebay is adopted, removal of accumulated sediment.

Repairing any damage to the profile resulting from scour, rill erosions or vehicle damage by replacement of
appropriate fill (to match onsite soils) and revegetating.
Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of clogging.
Regular watering/irrigation of vegetation until plants are established and actively growing.
Removal and management of invasive weeds (herbicides should not be used).

Removal of plants that have died and replacement with plants of equivilant size and species as detailed in

the plant schedule.

Pruning to remove dead or diseased vegetation material and to stimulate growth.
Vegetation pest monitoring and control.

Refer "Water by design" by HEALTHY WATERWAYS.

 

 

 

 

 

HARVESTING
&
RETENTION
2 . TANK
650m q [| LS
ROOF

389m? 5
DRIVEWAY
562m? 5

DRIVEWAY

‘amt

Wt

 

BIO RETENTION SYSTEM BRS3/1

mA
aa
aA

 

BIO RETENTION SYSTEM BRS.3/2

 

ao

WU

 

 

BIO RETENTION SYSTEM BRS 3/3

TREATMENT TRAIN

1. Use LUCERN OR EQUIVALENT for mulching

2. Do not use organic Soils or soil fractions
for filter layer.

3. Provide a suitable irragation system required
for the establishment of the plants and for
use in extended dry periods. Irragation
system shall be supplied from the

harvesting tanks.

4. Do not use any geotextile or related
products between filter and transition or
between transition and drainage layers.

5. Geotextiles may be used in addition to the
impermeable concrete & block surrounds.

6. Provide flush out points for subsurface

 

 

 

 

RECEIVING WATERWAYS

 

 

A

 

500

 

 

 

 

from carpark

raingarden is a garden bed which

uses native plants and free drainage

soils to treat the pollutants formed in

to raingarden

 

50

 

to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to stormwater that runs off the driveway Cc ree k
~ and carpark. Raingardens help to
protect our waterways.
y 0
BIORETENTION FILTER & RAINGARDEN MAINTENANCE CHECKLIST
BODY . .
CORPORATE NAME: DATE:
RESPONSIBILITY CENTRE . .
MANAGEMENT NAME: DATE:
OWNER NAME: DATE:
PROVIDE NAME AND DETAILS OF
MONTHLY (CONSULTANT IF APPOINTED:
INSPECTION QUARTER
FREQUENCY 6—MONTHLY
DROUGHT
AFTER_EVENT
INSPECTION ITEMS YES _|NO ACTION REQUIRED

 

 

Overall appearance healthy?

 

Overall appearance clean?

 

Gross litter _on surface?

 

 

Sediment accumulation at inlet?

 

Sediment accumulation on pe

bble surface?

 

Sediment accumulation at pipe outlets?

 

Sediment accumulation in bypass chamber?

 

 

Erosion at forebay?

 

Erosion at overflow?

 

Any other erosion?

 

 

Damage of support structure?

 

Any other traffic damage pre:

sent?

 

Damage to grates and lids?

 

 

Visual plant health ok?

 

Weeds apparent? Weeding required?

 

Watering required?

 

Irrigation functional?

 

Replanting required?

 

Mowing/slashing/pruning required?

 

 

Surface clogging visible?

 

Excess ponding evident?

 

Flushing required?

 

Point of discharge inspected

 

(pit/headwall/swale/creek)?

 

 

 

OTHER
OBSERVATIONS

 

 

SIGNATURE & DATE:

 

 

 

NOTE: A4 COPIES OF THE FORM CAN BE OBTAINED BY CONSTRUCTION HYDRAULIC

rp shr Roof water @
i Dw © ©
Bth
TANK SPECIFICATION IK | | | |
-1—-} saz 4-_] Vo pew 4-- '
TANK SIZE: 10,000 LITRE eng Tt ed foo _ ey.
DESCRIPTION: PRECAST ' LC “I VKNO 4 LEGEND
Be TO 1
i! [- | | “| | | T | SOLENOID SWITCHOVER DEVICE
1
PUMP_ SPECIFICATION i | J | © ¥oev | 2 RARVESTING TAME aE
. | ! y y 4 |REMOTE WATER LEVEL INDICATOR
MODEL ACTURER: TBE mt | | ex | | 5 PRESSURE LIMITING VALVE, 500 kPA MAX,
: || | | | | 1, NO {NO 6 |WATER METER
ty | L Lvl | | 7 | TEMPERING VALVE MAX 50°C
' mee 8 | FILTRATION DEVICE
SWITCHOVER DEVICE SPECIFICAITON lt Heater j a @ | | 9 RAINWATER PUMP
MANUFACTURER: TBC >60'C us NRV —— : NO |NORMALLY OPEN
UFACTURER: @ Kh z . ® NC | NORMALLY CLOSED
MODEL: TBC Hc 2 SI] | Yorvesting | | Vv | BALL VALVE
HWS & | | GV | GATE VALVE
NRV| NON—RETURN. VALVE
RAINWATER FILTRATION SPECIFICATION RW RW DCV| DOUBLE CHECK VALVE
MANUFACTURER: TBC mark "RAIN WATER” NRV GV [sludge zone! |
MODEL: TBC |
1
Stormwater RPB main.
HOT WATER SYSTEM SPECIFICATION System
MANUFACTURER: TBC
MODEL: TBC RAINWATER HARVESTING SCHEMATIC
800
|}~- |

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

Amd

Description Date

 

For Tender

Issue
For Development Approval X
For Building Approval

Notes Date
11-07-13

For Construction

As Constructed

 

E Hydraulic ::

 

\-

CONTACT:

CLIENT :

Ne

(PROJECT:

Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181

Moffat Beach, QLD, 4551

email: [email protected]

PH: (07) 5491 4333 FX: (07) 5491 4233

MARKRIS FOODS

ARCHITECT :

SOUL SPACE

42 HOFFMAN DRIVE
NOOSAVILLE
INDUSTRIAL DEVELOPMENT

A

DRAWING TITLE:

STORMWATER
QUALITY
MAINTENANCE

 

 

 

 

Design AH. Checked (Ch. Date 11-07-13 Dwg. No. AMD.
SCALE : N/A ON At UNO. 4 Of 4 2783-4 J
RPD:— LOT 3 / FMR LOT 2 SP 222982

 

Document Set ID: 21249132
Version: 1, Version Date: 28/09/2020

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENTS - MCU13 0098.01.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.