Original source · versioned page text
Properly Made Submission RC and TM Ladewig MCU12/0041
-,
We have grave concern about no planning of a new dam wall on the applicants land. The
dam wall is on our land. We would require that the applicant builds a dam wall on his
property and with an overflow filter system to our dam and No loss off water flowing to our
dam.
We are very concerned and will not accept the set back from our boundary is not enough
distance we will require at least 100 mts set back. The reason for this is we will have to
spray our crops for disease control and fertilise application through irrigation. We cannot
stress this point strong enough. If the ponds are too close to our boundary this will restrict
our farming operations.
We will require a management plan for the management of the water quality on a six
monthly period.
This application is not a small scale development of Aquaculture. Our Investigation indicates
this is a large scale development that could impact our future farming on our land. The Rural
Futures study indicates that all available good agriculture land should be protected. We
submit we have grown very successfully ginger, strawberries and Sugar cane on land that
has this application for aquaculture. The land we own we have grown crops as mentioned
above.
Please find inclosed photos of extreme wet weather conditions on applicant property lot 7
on MCH793.
Kind Regards,
~q
Mrs T.M Ladewig & Mr R C Ladewig
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.