RFI - Rehabilitation Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable 6: Maintenance Schedule for the Rehabilitation Areas (to be adapted on the ground in accordance with the weather conditions)
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
Initial weed Soil preparation Regular watering Regular watering Regular watering Ongoing weed Ongoing weed Ongoing weed Supplementary Regular watering Regular Final round of
management and of planted stock of planted stock of planted stock management and management and management and planting to of planted stock watering of weed
site preparation monitoring of monitoring of monitoring of replace dead planted stock management
Planting and growth of planted growth of planted growth of stock including
Ongoing weed
mulching (and Ongoing weed Ongoing weed Ongoing weed stock stock planted stock watering Ongoing weed
management
Erect temporary installation of management management management management
Ongoing weed
fences if not tree guards if
management
using tree guards not using
Monitoring of
fencing). Monitoring of Monitoring of Monitoring of Monitoring of
growth of
Planting to be growth of planted growth of growth of planted growth of planted
planted stock
done after the stock planted stock stock stock
house is being
built
Watering (after
the house is
being built)
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Maintenance Schedule Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP9_REV A ABN: 20 162 130 627
See the original