Original source · versioned page text
RFI - Rehabilitation Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnMaintenance schedule, monitoring and reporting
This section outlines the required monitoring and maintenance actions for the rehabilitation areas, and the person/s responsible for undertaking these tasks. The maintenance schedule is shown in Tables 5 & 6. A 12 month maintenance and monitoring period
is to be provided.
Table 5: Maintenance and Monitoring Schedule for the Rehabilitation Zone
TIME PERIOD MONITORING TASKS REMEDIAL ACTIONS MONITORING AND REPORTING
Months 0 – 3 • Identify priority areas for treatment, rubbish and weeds to be Not Applicable Not Applicable
removed, identify necessary weed control techniques etc.
• Initial weed control for all rehabilitation zones
• Implement revegetation works including installation of stakes,
tree guards, jute mat/mulch, fencing etc as required
• Watering of any planted stock
Months 4-6 • Check appropriate weed removal/control has been implemented • Undertake replacement planting if tubestock death is apparent. • Monthly monitoring must be undertaken to ensure the rehabilitation is
and is working. • Ongoing weed management undertaken in accordance with this plan
• Check on survival rates of planted tube stock • If plants are being excessively grazed by wildlife, then implement suitable
• Check levels of herbivory on planted stock protection measures to reduce grazing
Months 6-12 • Check on the performance of weed removal/control methods • Increase weed management works if required, or implement alternate weed • Monthly monitoring must be undertaken to ensure the rehabilitation is
• Check on survival rates of planted tube stock control technique. undertaken in accordance with this plan
• Check levels of herbivory on planted stock • Undertake replacement planting if tubestock death is apparent • Perform any final remedial works are required to achieve the nominated
• If plants are being excessively grazed by wildlife, then implement suitable performance criteria
protection measures to reduce grazing (better/more fencing, better/more
tree guards)
• Provide watering and maintenance of any newly planted stock
• Undertake any other works required to achieve the performance criteria and
obtain off-maintenance status at the 12 month mark
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Maintenance Schedule Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP9_REV A ABN: 20 162 130 627