RFI - Rehabilitation Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnMONITORING AND MAINTENANCE SCHEDULE
Performance Criteria
Table 4 outlines the performance criteria for works within the rehabilitation area. Vegetation maintenance will continue as required under the set timeframe of 12 months for the monitoring/maintenance program. Vegetation maintenance works will be deemed
completed and accepted once the following criteria for rehabilitation are achieved following the 12-month monitoring/maintenance program.
Table 4: Performance Criteria for Rehabilitation Works.
ELEMENT COMPLETION OF INITIAL WORK AND ESTABLISHMENT PERIOD (months 1-3) COMPLETION OF FINAL WORK (12 months from start of works)
Tubestock survival 90% survival rate for planted tubestock, taking into consideration the density of any natural regeneration. Mortalities to be 90% survival rate. Any natural regeneration to be retained within rehabilitation area
replaced to achieve 90% survival rate at completion.
Mulching or matting Mulch or jute matting installed around planted species. Mulch or jute mat cover maintained around planted species.
Declared Weeds Minimal presence of declared weeds Minimal presence of declared weeds
Environmental woody weeds Minimal presence of environmental woody weeds Minimal presence of environmental woody weeds
Rubbish All rubbish to be removed during initial works. Site to be maintained free of anthropogenic rubbish.
DISCLAIMER:
PROJECT TITLE: SHEET TITLE:
Designs documented on this drawing are the property of Green
Rehabilitation Management Plan – Monitoring and Maintenance Schedule Tape Solutions and are not authorised for reproduction or use in
whole or part without written permission. These plans have been
178 Davis Rd, Cootharaba prepared for the exclusive use of the client. Green Tape Solutions
does not accept responsibility for any use of or reliance upon the
contents of these drawings by any third party. Confirm all
CLIENT: SHEET NUMBER: Compiled by QA DATE dimensions on site and clarify any discrepancies prior to
construction.
RH RH 27.10.22
Paul Desouza RMP8_REV A ABN: 20 162 130 627