           5737_DA‐05‐01                   01           Sections prepared by Blackburne Jackson Design             22‐07‐21
           5737_DA‐17‐01                   05           Perspective Views prepared by Blackburne Jackson           05‐08‐21
                                                        Design
        Please note that we have also included a copy of the window schedule and structural detailed plans for Council’s
        information only within Appendix A.

        Condition 64
        Request: The total headworks contribution amount for CTS 400 will require updating to reflect the changes to the
        breakdowns of the land use categories. Our calculations below are based upon CPI up to March 2019, as headwork
        contributions have been paid for the existing Facilities Building, CPI should only apply to the additional charge. The
        wording or figures requiring amendment have been highlighted below:‐
        64.        Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
                   various infrastructure at the rates applicable at the time of payment. An estimate only of the amended
                   contribution amounts relating to this “Change to an Existing Approval” dated 18 October 2019 under the
                   Council policies and requirements applied on the original approval is outlined in the table below:
                                            PSP12 –
                                          Public Open
                                             Space
                                         Contributions          PSP16 –       PSP17 – Water      PSP20 –         TOTAL
                    Contribution         (Not applicable in    Sewerage          Supply       Pathway Trunk    Contribution
                    Required For:         accordance with      Headworks       Headworks         Network       Amount per
                                           Council letter     Contributions   Contributions    Contributions
                                         dated 24 January
                                                                                                                  Stage
                                         1996 and Council
                                            Decision of 1
                                          November 2007)

                    Stage CTS 100               $0              $49,553         $166,655         $26,419         $242,627
                    Stage CTS 200               $0              $17,719         $59,082          $9,127          $85,928
                    Stage CTS 300               $0              $33,036         $111,475         $17,613         $162,124
                    Stage CTS 400                               $8,145          $21,851          $4,151         $34,147
                                                $0
                    Resort Facilities                           $8,864          $24,198          $3,539         $36,601
                    Stage CTS 500               $0              $39,943         $132,655         $20,468         $193,066
                    Stage CTS 600               $0              $18,069         $59,825          $9,153          $87,047
                    Stage CTS 700               $0              $19,371         $64,655          $10,007         $94,033
                    Stage CTS 800               $0              $22,994         $76,427          $12,097         $111,518
                    Stage CTS 900               $0              $14,866         $50,164          $7,926          $72,956
                    TOTAL
                                                               $223,696        $742,789        $116,961        $1,083,446
                    Contribution                $0
                    Amount =                                   $224,415        $745,136        $116,349        $1,085,900

                    Please note that these amounts are all subject to variations in the Consumer Price Index, All Groups
                    Brisbane from March 2019 until the date of payment.

                   All contributions must be paid prior to commencement of the use.
                   Water Supply and Sewerage contributions are payable directly to Unitywater

        Condition 83
        Request: The roofed area of the Outdoor Dining Area of the Café/Restaurant component of the Facilities Building is
        proposed to be fully enclosed but will operate as both indoor and outdoor dining in accordance with the updated


JFP Ref: M2652/F                                                                                                              Page 4

Used in these records

About this file

File size
455 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Cover Letter_rec 25-08-2021.pdf · 455 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.