Response to Information Request

Attached to the e-mail Response to Council's Request for Information (REC17 /0011) - Email 01 of 01.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

requirements (PSP 5 – Engineering Design Standards – Roads, Drainage and
Earthworks) and the relevant State Planning Policies

It is noted that the current strategy may capture and treat stormwater that is
external to the site, it must be clearly stated how the external catchment
stormwater will influence the mitigation measures.

Council also has concerns with the capacity of the proposed easement through No
29 Tait Street to cater for the overland flows of stormwater in a major rain event.

The submitted staging/layout plan does not indicate the proposed stormwater
drainage easements for the internal and external catchments.

Information Required

   5. Provide a Stormwater Management Plan for the development detailing the
      assumptions, calculations and results that demonstrate compliance with
      the Noosa Shire Council Planning Scheme (PSP 5 – Engineering Design
      Standards – Roads, Drainage and Earthworks) and the State Planning
      Policy. The report must also include:
      (a) comment regarding the overland flow of stormwater into and through
          the site during significant rain events and specifically the proposed
          easement through No 29 Tait Street
      (b) the capacity of the downstream drainage system in Tait Street to cater
          for
          the additional runoff

Response:

In response to Item 5 of Council’s Information Request, the enclosed Integrated
Water Management Plan Revision 1 (IWMP Rev 1) prepared by Haynes Consulting
Engineers and attached in Appendix B, specifically Section 2.0 responds to this
Item.

   6. Indicate on the revised staging/layout plans all necessary stormwater
      easements (underground and overland flow)

Response:

In response to Item 6 of Council’s Information Request, plan 1702-01B prepared
by Haynes Consulting Engineers (attached in Appendix C) shows the required
stormwater easements. The Amended Plan of Development (Plan No. 60500/A),
prepared by Murray & Associates (Qld) Pty Ltd (Appendix A) also shows the
stormwater easements.

Issue 5

The submitted material does not include an indication of the finished levels or the
configuration of the new road formation.
Log in to download the original file

Response to Information Request.pdf · 354 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.