BR190571 - BP Noosaville RFI Response Letter

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Item 2
Issue: Required frontage works due to the development works.
Information Required:
Provide or amend engineering plans to include the following details:
            a. Relocating the existing large directional sign in accordance with the
               specifications of DTMR that achieve acceptable clearance from existing
               and proposed driveways.
            b. Removal of the redundant existing driveways and reinstalment of the road
               verge, pathway and kerb line to match existing and/or proposed new works.
            c. Line marking and parking signage, where required, to reinstate the two
               removed on- street parking spaces.
    - ACOR Response:
ACOR can confirm the existing large directional sign is to be relocated to an alternate
location with adequate clearances from the proposed crossover and other existing
services. The existing driveways will be removed, and the verges will be reinstated as
per Noosa Council Standards. ACOR have not included line marking on the 2
replacement car parks as there is currently no carpark line marking within the street.
However, the site works plan has had dimensions included to demonstrate that there
is sufficient space to for 2 car parks to replace the carparks that were removed. In
review the existing line marking for parking along Mary street it must be noted that
no line marking has been provided, ACOR are matching the existing.

Item 3
Issue: Driveways’ clearances from existing and proposed public services.
Information Required:
Confirm that edge of driveways complies with the normally required clearance of 1.0m from
existing and proposed public services (eg stormwater pit’s inlet lentil, power poles, Telstra
pits, water metres). Where the clearance is less than 1.0m, consultation and written
endorsement is required from the relevant authority.
      -     ACOR Response:
ACOR can confirm the crossovers have been offset from existing services to ensure
the 1.0m offset has been achieved, Dimensions have been added to the plans to
demonstrate the requirements have been achieved.




P:\BR19\BR190571 BP Noosaville\Authorities\NC\200828 - OPW RFI\BR190571 - BP Noosaville RFI Response Letter.docx
Log in to download the original file

BR190571 - BP Noosaville RFI Response Letter.pdf · 360 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.