Skip to the record
Accept no imitations.

Original source · versioned page text

BR190571 - BP Noosaville RFI Response Letter

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Item 9
Issue: There are concerns regarding any proposed connection of treatment devices/sumps
from the refuelling area into the stormwater disposal system.
Information Required:
Provide details and confirmation regarding the disposal system of hydrocarbons
contaminated water from the site that include:
           a. A pump out tank (blind tank) as the preferred method given the sensitivity of
              the site to flooding and tidal water impacts and its proximity to an
              environmental preservation area.
           b. Provide advice on how the treatment device/s for hydrocarbons
              contaminated water specified for the site will function during a flood event
              and/or a high tidal event ie what prevents captured hydrocarbons from
              being released during adverse weather and/or tidal conditions.
      -     ACOR Response:
The client has opted to use an EnviroTank product for capture and disposal of
hydrocarbons onsite. The information package has been provided to council for
review. The design and certifications package for the tank has also been included in
this submission. In relation to council’s concerns surrounding the flood impacts on
the device ACOR are proposing to install a chamber with a bolt down lid and one way
valve on the inlet pipe to aid in keeping the stored hydrocarbons inside the system.
This system has been approved by Noosa Council’s Environmental team please see
email attached in RFI Package.

Item 10
Issue: Some of the specified plant species on the landscaping plans do not comply with
Planning Scheme Policy 3 Landscaping Plants and Guidelines as required by condition 36
of the higher order approval.
Information Required:
Provide amended landscape plans which document compliance with condition 36 by
utilising local native species suitable for the locality.
      -     ACOR Response:
Saunders Havill Landscape have advised that council’s the amendments have been
completed utilising practical native species in accordance with the planning scheme..

Item 11
Issue: Condition 36 (e) of the higher order approval requires advanced tree stock (min
100L) to be planted west of the entry access on Mary Street. No advanced tree is shown in
the location on the submitted landscape plans.
Information Required:
Provide amended landscape plans which document compliance with condition 36 (e) by
providing the required tree stock in the specified location.
      -     ACOR Response:
Saunders Havill Landscape have advised that an advanced specimen has been
included in the S.E corner of the site.




P:\BR19\BR190571 BP Noosaville\Authorities\NC\200828 - OPW RFI\BR190571 - BP Noosaville RFI Response Letter.docx
Log in to download the original file

BR190571 - BP Noosaville RFI Response Letter.pdf · 360 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.