BR190571 - BP Noosaville RFI Response Letter
Item 12
Issue: `
Information Required:
Provide amended landscape plans showing the provision of soft landscaping between the
northern face of the building and the northern boundary, consistent with the approved
higher order landscape plan.
- ACOR Response:
Saunders Havill Landscape have advised that the plans have been amended to
include shade tolerance species between the northern boundary and the northern
façade.
Item 13
Issue: Performance bond requirement
Information Required:
Note: That bond payment is required in compliance with Condition 9 of the higher order
approval (MCU19/0089) prior to issuing a Development Permit for Operational Works.
- ACOR Response
The performance bond has not been paid at this point in time, however ACOR have
been in contact with Noosa council requesting an invoice be made out to Chris
Wessel Family Trust & Paul Wessel Family Trust to facilitate the payment of the cash
bond.
The client has advised that payment will be made once the invoice is provided by
Noosa Council.
Should you have any queries, please do not hesitate to contact myself or Jacob Vogler in
relation to this letter and the attached documentation.
Yours sincerely,
ACOR Consultants
Shane Suffolk
RPEQ:9330
Senior Civil Engineer
Attachments
- Ocean Protect Stormwater Quality Package.zip
- Saunder Havill Updated Landscape Plans 9327 L 01 05 C
- Intotem Refuel Drawings 2019065-CD-F150(A)
- EnviroTank Details & Certification
- EnviroTank Approval Email from Noosa Council
- BR190571 – Civil Set
P:\BR19\BR190571 BP Noosaville\Authorities\NC\200828 - OPW RFI\BR190571 - BP Noosaville RFI Response Letter.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.