8.2 Is the proposed operational work for any of the following?
Interfering with quarry material as defined under the Coastal Protection and Management Act Yes No
1995 on state coastal land above high-water mark
Disposing of dredge spoil or other solid waste material in tidal water Yes No
Constructing an artificial waterway Yes No
Removing or interfering with coastal dunes on land, other than State coastal land, that is in an Yes No
erosion prone area as defined in the Coastal Protection and Management Act 1995 and above
high-water mark
If you answered no to all of the above, a development permit is not required for this aspect of development and
that is the end of part 8 of this checklist
If you answered yes to any of the above, continue to question 8.3
8.3 Is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act 2005?
No This application may require assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Tidal works, or development in a coastal management district state
code in the SDAP.
You must complete IDAS form 23—Tidal works and development within coastal management districts
End of part 8 of this checklist
Yes Continue to question 8.4
8.4 Is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
No This aspect of the development is prohibited development and a development application cannot be
made
End of part 8 of this checklist
Yes Continue to question 8.5
8.5 Will the proposed operational work be carried out on land to which a property development plan
applies?
No This application may require assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Tidal works, or development in a coastal management district state
code in the SDAP.
You must complete IDAS form 23—Tidal works and development within coastal management districts
End of part 8 of this checklist
Yes Continue to question 8.6
8.6 Is the proposed development consistent with the property development plan?
No This aspect of development is prohibited development and a development application cannot be
made
End of part 8 of this checklist
Checklist 4—Operational work
Version 4.0—16 May 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sara-idas-checklist-4-operational-work.pdfRelated documentApplication case desk ↗
About this file
- File size
- 145 KB (small file)
- File type
No other editions are linked here.