Checklist 4—Operational work · OPW16/0229
Attached to the e-mail Operational Works Application - OPW16/0229.
Yes This application may require assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Tidal works, or development in a coastal management district state
code in the SDAP.
You must complete IDAS form 23—Tidal works and development within coastal management districts
This aspect of development will be subject to the relevant wild river declaration for the area and
assessment may be required for the purpose of the Wild Rivers Act 2005
End of part 8 of this checklist
Section reference:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18
Sustainable Planning Act 2009, schedule 1, items 2 and 4
Part 9—Waterway barrier works
9.1 Is the proposed operational work any of the following:
Work that is self-assessable development under schedule 3, part 2 of the Sustainable Yes No
Planning Regulation 2009
Work carried out on premises to which structure plan arrangements apply Yes No
If no to all of the above, continue to question 9.2.
If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required. End of part 9 of this checklist.
9.2 Is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act
2005?
Yes A development permit is required for this aspect of development. This application requires
assessment by the chief executive of DSDIP as assessment manager or concurrence agency against
the Constructing or raising waterway barrier works in fish habitats state code in the SDAP.
You must complete IDAS form 27—Waterway barrier works
Yes Continue to question 9.3
9.3 Is any of the proposed operational work to be carried out in a wild river high preservation area or a wild
river special floodplain management area?
No Go to question 9.5
Yes Continue to question 9.4
9.4 Is the works for any of the following?
Specified works in the area Yes No
Maintenance of existing waterway barrier works Yes No
Constructing or raising temporary waterway barrier works associated with the carrying out of Yes No
specified works or the maintenance of existing waterway barrier works
Constructing new waterway barrier works, or raising of an existing waterway barrier works, Yes No
within the Lake Eyre Basin for storing water for town water supply demands
Authorised wild river operational work for the area Yes No
Checklist 4—Operational work
Version 4.0—16 May 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sara-idas-checklist-4-operational-work.pdfRelated documentApplication case desk ↗
About this file
- File size
- 145 KB (small file)
- File type
No other editions are linked here.