Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Checklist 4—Operational work · OPW16/0229

Attached to the e-mail Operational Works Application - OPW16/0229.

of 23

Text shows just the words. Original shows the document exactly as it was published.

11.5 Is the proposed development consistent with the property development plan?

    No           This aspect of development is prohibited development and a development application cannot be
                  made
                 End of part 11 of this checklist
    Yes          A development permit is required and this application requires assessment by the chief executive of
                  DSDIP as assessment manager or concurrence agency against the Removal, destruction or damage
                  of marine plants state code in the SDAP.
                 You must complete IDAS form 26—Marine plants and declared fish habitat areas
                 End of part 11 of this checklist.

Section reference:
   Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 8
   Sustainable Planning Regulation 2009, schedule 3, part 2
   Sustainable Planning Regulation 2009, schedule 7, table 2, item 30
   Sustainable Planning Act 2009, schedule 1, items 2 and 7

Part 12—Great Barrier Reef Wetland Protection Areas

12.1 Is the proposed operational work for a domestic housing activity only?

    No           Continue to question 12.2
    Yes          A development permit is not required for this aspect of development and this is the end of the
                  checklist

12.2 Is the proposed operational work the natural and ordinary consequence of a material change of use or
     reconfiguring a lot for which the state was a concurrence agency under schedule 7, table 3, item 21A or
     table 2, item 43A of the Sustainable Planning Regulation 2009?

     No          Continue to question 12.3
     Yes         A development permit is not required for this aspect of development and this is the end of the
                  checklist

12.3 Is the proposed operational work associated with government supported transport infrastructure or
     electricity infrastructure?

     No          A development permit is required and this application requires assessment by the chief executive of
                  DSDIP as assessment manager or concurrence agency against the Wetland protection area state
                  code in the SDAP.
                 You must complete IDAS form 33—Great Barrier Reef Wetland protection area
                 End of part 12 of this checklist
     Yes         A permit is not required for this aspect of development but the proposed work must comply with any
                  applicable self assessable code
                 End of part 12 of this checklist

Part 13—Construction or modification of a levee

13.1 Will the proposed operational work result in any of the following off-property impacts:

A change to the flow path of overland flow water where it enters or exits the property                Yes          No



                                                                                              Checklist 4—Operational work
                                                                                                 Version 4.0—16 May 2014

Used in these records

About this file

File size
145 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

sara-idas-checklist-4-operational-work.pdf · 145 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.