Checklist 4—Operational work · OPW16/0229
Attached to the e-mail Operational Works Application - OPW16/0229.
An increase in the velocity of flood flow beyond the boundaries of the property Yes No
An increase in flooded area beyond the boundaries of the property Yes No
An increase in flood height beyond the boundaries of the property Yes No
If no to all of the above this development is categorised as a Category 1 levee and must comply
with any applicable self-assessable code – end of this checklist
If yes to any of the above continue to question 13.2.
13.2 Will the proposed operational work result in any of the following impacts:
An increase in flood height above the floorboards in an occupied building that results in 3 or Yes No
more people being affected
An increase in flood velocity above the floorboards in an occupied building that results in 3 or Yes No
more people being affected
If no to all of the above:
- This is categorised as a Category 2 levee and is subject to code assessment
- A development permit is required and this application requires assessment by the local
government as assessment manager against the applicable code for the construction or
modification of a levee
- You must complete IDAS form 20—Interfering with overland flow water and construction or
modification of a levee.
- End of this checklist.
If yes to any of the above:
- This is categorised as a Category 3 levee and is subject to impact assessment
- A development permit is required and this application requires assessment by the local
government as assessment manager against the applicable code for the construction or
modification of a levee
- This application will require assessment by the chief executive of DSDIP as concurrence agency
against the Construction or modification of levees state code in the SDAP
- You must complete IDAS form 20—Interfering with overland flow water and construction or
modification of a levee.
- End of this checklist.
Section references:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 11
Sustainable Planning Regulation 2009, schedule 7, table 2, item 48.
Privacy—please refer to your assessment manager for further details on the use of information recorded in
this form
Disclaimer:
While the Department of State Development, Infrastructure and Planning (DSDIP) believes that the information
contained on this checklist and provided as part of this process will be of assistance to you, it is provided on the basis
that you will not rely on the information. It is your responsibility to make your own enquiries regarding the interpretation
and application of the applicable legislation to your circumstances.
To the full extent permitted by law, DSDIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this checklist.
Checklist 4—Operational work
Version 4.0—16 May 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sara-idas-checklist-4-operational-work.pdfRelated documentApplication case desk ↗
About this file
- File size
- 145 KB (small file)
- File type
No other editions are linked here.