Checklist 4—Operational work · OPW16/0229

Attached to the e-mail Operational Works Application - OPW16/0229.

of 23

Text shows just the words. Original shows the document exactly as it was published.

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 1
     Sustainable Planning Regulation 2009, schedule 7, table 2, item 4 and schedule 7, table 3, item 10
     Vegetation Management Act 1999, section 22A


Part 3—Operational work for reconfiguring a lot

3.1    Is any part of the operational work for reconfiguring a lot in a priority development area?

      No         Continue to question 3.2
      Yes        This aspect of the development is not assessable development.
                 End of part 3 of this checklist

3.2    Do all of the following apply:
           the land is in the area of a local government that, under the South East Queensland Water
            (Distribution and Retail Restructuring) Act 2009, is a participating local government for a
            distributor–retailer
           the participating local government is the assessment manager
           the development application is made before 1 March 2014

      No         This aspect of the development is assessable development and you will need a development permit.
                 The local government will be the assessment manager for the application.
                 End of part 3 of this checklist
      Yes        This aspect of the development is assessable development and you will need a development permit
                 The local government will be the assessment manager for the application and the distributor–retailer
                  (or SARA) will be a concurrence agency for the application.
                 End of part 3 of this checklist

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
     Sustainable Planning Regulation 2009, schedule 7, table 2, item 47

Part 4—Taking or interfering with water

4.1    Is the proposed operational work to be carried out in a priority development area or on premises to
       which structure plan arrangements apply?

      No         Continue to question 4.2
      Yes        This aspect of development is not assessable development and does not require a development
                  permit.
                 End of part 4 of this checklist.

4.2    Does any of the proposed operational work involve taking or interfering with water from a watercourse,
       lake or spring or from a dam constructed on a watercourse or lake?

      No         Go to question 4.17
      Yes        Continue to question 4.3




                                                                                             Checklist 4—Operational work
                                                                                                Version 4.0—16 May 2014

Used in these records

About this file

File size
145 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

sara-idas-checklist-4-operational-work.pdf · 145 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.