Skip to the record
For the highest quality transcripts.

Council archive · source document

Checklist 4—Operational work · OPW16/0229

Attached to the e-mail Operational Works Application - OPW16/0229.

of 23

Text shows just the words. Original shows the document exactly as it was published.

4.3    Are the proposed works for any of the following purposes?

Taking water from a watercourse, lake or spring in an emergency situation for a public                      Yes          No
purpose or fighting a fire destroying, or threatening to destroy, a dwelling house
Taking water from a watercourse, lake or spring if:                                                         Yes          No
     the water is taken by the owner of land adjoining the watercourse, lake or spring
     the water is taken for domestic purposes or stock purposes
Taking water from a watercourse, lake or spring for camping purposes or for watering                        Yes          No
travelling stock
Using a water truck to pump water                                                                           Yes          No

     If no to all of the above, continue to question 4.4
     If yes to any of the above, this aspect of development does not require a development permit.
      - If this is the only aspect of taking or interfering with water proposed then that is the end of part 4 of this checklist
      - If there are other aspects of taking or interfering with water proposed, continue to question 4.4

4.4    Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the
       Sustainable Planning Regulation 2009?

      No          Go to question 4.5
      Yes         This aspect of development is self-assessable development and must comply with any relevant self-
                   assessable code
                  If the proposal involves more than one aspect of operational work for taking or interfering with water,
                   and the other aspect is not self-assessable development, then continue to question 4.5

4.5    Is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act
       2005?

      No          Go to question 4.12
      Yes         Continue to question 4.6

4.6    Do both of the following apply:
           The proposed operational work is to be carried out in a wild river high preservation area or a wild
            river special floodplain management area
           the work interferes with the flow of water in a watercourse, lake or spring in the area

      No          Go to question 4.8
      Yes         Continue to question 4.7

4.7    Do any of the following apply?

The works are for the maintenance of works as defined under the Water Act 2000                              Yes          No
The works increase the interference with water in Lake Eyre Basin to the extent necessary for               Yes          No
taking water for town water supply demands
The work is authorised wild river operational work for the area                                             Yes          No




                                                                                                    Checklist 4—Operational work
                                                                                                       Version 4.0—16 May 2014

Used in these records

About this file

File size
145 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

sara-idas-checklist-4-operational-work.pdf · 145 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.