Original source · versioned page text
MCU14/0056 Information Request
MCU14/0056 a). facilities must be located at least 6 metres but no more than 100 metres from the site; and b). where there are 40 sites or fewer, one pedestal for every 7 sites must be provided for female occupants, one pedestal for every 10 sites must be provided for male occupants, and a 0.6 metre urinal must be provided for every 20 sites (or part thereof) for male occupants; and c).where there are more than 40 sites, the appropriate number of toilet facilities shall be as provided in caravan park industry guidelines; and (ii) individual toilets, showers or baths must be adequately screened for privacy; and (iii) separate ablution facilities for each gender must be provided in the ratio of one shower or bath and hand basin to every 15 sites; and d) be provided with adequate laundry facilities for use by residents e) be provided with a suitable “dump point” connected to sewer for use by campers to dispose of sewage holding tanks etc. f) any other information that would support the issue of a permit for the accommodation park under the Local Law. Issue – Waste Management Waste Management – waste storage, collection and transport has not been adequately described in the proposal. To ensure waste is adequately managed and complies with the Waste Reduction and Recycling Act 2011 the following information is requested to help assess the proposal and determine if the design is suitable. Information Required 44 Please provide a Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, for the day-to-day operation of the development, including an integrated approach to the waste management for the service station, accommodation park, food sales shop and fast food drive thru. The plan is to be submitted and approved by council prior to the issue of the Decision Notice for Operational Works. The Plan should include the following information as a minimum: a) The types of waste that will be generated from the activities approved within the development. b) Estimated volumes or tonnage of both recyclables and waste generated. c) Methods to be used for dealing with any green waste. d) Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. e) Description of procedures for getting all waste to the bins; the storage of bins and the collection of bins by the contractor. f) A description of the design details of waste storage and recycling areas including size, location, elevation, enclosure/s, floor plan and methods of bin washing that prevent contamination of storm water and an appropriately sized bin wash area drained to sewer. The bin wash area should have as a minimum: a cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed, or any other design approved by Council. Page 11 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.