Original source · versioned page text
MCU14/0056 Information Request
MCU14/0056 a) Detailed drawings showing the proposed design of service station including underground and/or above ground storage capacity of flammable and combustible liquids on site b) Maximum storage volume of storage tanks and type of fuel c) Describe the type of storage tanks (e.g. double containment FRP etc.) d) Location of tanks & distances to protected works, including site plan etc. e) Leak detection methods proposed (e.g. statistical inventory analysis, automatic tank gauging, electronic line leak detection, safe suction etc) - at least 2 methods capable of detecting a leak at a rate of 0.76 litres per hour or more with at least 95% accuracy and a probability of false detection of 0.05 or less f) proposed ground water monitoring wells and location g) vapour recovery design proposed (Type 1and/or Type 2) h) clarify the description of the forecourt spillage containment system and drip line using drawings and contours etc (i.e the system to capture all spilt fuels and other contaminants as a result of the dispenser pumps operation and bulk delivery filling of the underground/above ground tanks) i) describe the capacity of forecourt containment vessel (i.e. minimum 10,000 l sump/tank with no connections to stormwater and with/without connections to sewer). It appears that the Puraceptor system is also to be used to capture flows/spills from the fuel dispensing area as well as the blind sump/tank) where it is stated in Item e Service Station Treatment - “It is proposed that a SPEL Puraceptor containment system be installed to capture and retain flows from the fuel dispensing areas”. j) clarify the use of the Puraceptor system for treatment of stormwater runoff from uncovered (non-fuel dispensing areas) of the service station to remove contaminants prior to discharge to stormwater system k) any sewer pre-treatment devices/options (if any) consistent with Unitywater’s Trade Waste Policy and/or advice l) regulated waste removal and disposal options m) any other information that supports environmental protection including the protection of the water supply catchment Issue - Local Law No.1 (Administration) 2011 - Accommodation The operation of the accommodation park is a prescribed activity under Local Law No.1 (Administration) 2011 - Accommodation, which requires plan approval and an annual approval to operate. Further details are required to adequately assess the proposal and determine if the design will comply with the Local Law. Information Required 43 Confirm the design for the accommodation park satisfies following criteria identified under Local Law 1: a) camp sites must be large enough to allow a 1.8 metre separation distance between sites, or if devices are used to secure a tent, between the devices and the adjacent tent or devices used to secure it; and b) every site shall have a well drained surface and where concrete pads are provided they should be designed and built in accordance with the current Australian Standard; and c) a sufficient number of conveniently located and suitably equipped toilet and ablution facilities must be provided for each gender in accordance with the following guidelines— (i) where private ensuite facilities are not provided for accommodation on a site— Page 10 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.