Original source · versioned page text
MCU14/0056 Information Request
MCU14/0056 Guidelines for Water Quality Management in Drinking Water Catchments of 2012 is relevant to the development. Information Required 14 Demonstrate how the development will achieve the State Interest, as described in the State Planning Policy Guideline – State Interest – Water Quality August 2014. 15 Demonstrate the development is consistent with the SEQ Water Development Guidelines: Development Guidelines for Water Quality Management in Drinking Water Catchments 2012. ENGINEERING Issue - Flooding The development site (particularly the area of the proposed tourist park) may be subject to flooding and stormwater ponding during major storm events. The proposed development may adversely impact on the existing flooding and drainage conditions on other properties and/or public roads. Information Required 16 Provide detailed assessment of the upstream drainage catchment/s taking into consideration any overflows from adjacent catchments and stormwater runoff from roads (eg from Bruce Highway) onto the site. The assessment and report must be prepared by RPEQ specialised in this field and include in particular: (a) Plan/s and data showing the extent of flooding (floodline) for 1% AEP storm event on the development site and the relevant downstream properties and roads (eg the Golf Course and Myall Street) for pre-development conditions. (b) The general internal drainage layout and any proposed or anticipated required stormwater drainage works and mitigation works external or internal to the site. (c) Plan/s and data showing the extent of flooding for post development conditions on the fully developed site and the relevant downstream properties and roads for 1%, 5% and 10% AEP storm events. (d) Identification of potential adverse impact on other properties and recommended mitigation measures. Issue - Earthworks The survey plan indicates the difference in ground levels across the proposed development area of approximately 10 metres. Significant earthworks and retention works throughout the development site are likely to be required. Information Required 17 Provide plan/s to illustrate the estimated amount and levels of the earthworks required on the site and include cross sections to demonstrate the changes in finished levels, and associated structures, within the development site. Issue – Heavy Vehicles Insufficient details have been provided regarding the types (particularly refuelling trucks), access paths and manoeuvring of trucks for deliveries and services on the site. Page 4 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.