Original source · versioned page text
MCU14/0056 Information Request
MCU14/0056 Information Required 18 Provide information regarding the trucks expected to access the site and include in particular: (a) Types of trucks expected to access the site for petrol fuelling and the refuelling of fuel storage tanks. (b) Access path of deliveries and service vehicle from the roads and within the site. (c) Plan/s to show the manoeuvring and truing movements for delivery trucks accessing the loading bay/s of the food store and the fuel storage tanks for refuelling (clarify if the fuel tanks are above or underground). Issue - Traffic A number of traffic and accessibility issues require further assessment and resolution. Information Required 19 Justification for the proposed commercial development having access via Ferrells Road, which functions as a minor residential collector street, or alternatively, provide amended plans and analyses based on all access via the proposed Myall Street access. If access to and from Ferrells Road continues to be proposed, explain how service vehicle ingress or egress via Ferrells Road will be avoided. 20 Justification for the proposed convenience retail and fast food facilities being located so remote from the town centre of Cooroy, so that virtually all external trips must be via private vehicle. 21 Provide analysis of the development impact on the traffic conditions within Cooroy CBD and particularly on the intersection of Myall Street with Elm Street (the railway overpass) and include recommended works to offset impacts at this intersection. 22 Explain the expected or intended relationship between the proposed development and the adjacent Bruce Highway, given that it is proposed to be located immediately adjacent to an all-turns interchange with the highway. It appears that, depending on signage, it could be intended to function as a service centre to two separate facilities – both Myall Street and the Bruce Highway. This will be particularly relevant in respect of the discussion at Section 4.2.1 of the Pekol Traffic and Transport Report. In particular, any “drop-in” traffic diverted from the Bruce Highway will effectively be “new trips” in respect of the Myall Street intersections. 23 Taking into account the item above, provide further justification for the design traffic generations discussed in Section 4.2.1 of the Traffic and Transport report, and provide the results of new analysis if design generation rates are adjusted. 24 The results of appropriate speed surveys to justify the design speeds adopted for sight distance and geometric design purposes. 25 Further details to identify clearing requirements within the road reserve, sign relocations and property boundary or fence set-backs which might be necessary to provide satisfactory sight distances to and from the proposed site access intersection with Myall Street. Page 5 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.