Original source · versioned page text
MCU14/0056 Information Request
MCU14/0056 Information Required 37 Label the nominated sizes for each basin on the drawings and ensure adequate footprint is included on the design to include the required filter media area plus sediment forebays plus 1:4 batters around the edges of the basins and maintenance access points. Also propose estimated inlet and outlet levels for the stormwater drainage to and from each biobasin. Issue – Basin Discharge It appears that waters treated in the service station bioretention basin will also enter the self storage biobasin, or vice versa. There is concern that some waters will unnecessarily be retreated/impede the treatment capacity of the recieving basin. The outlet point is unknown. Information Required 38 Please demonstrate that discharge from the self-storage area bioretention basin will have a legal point of discharge and will not be retreated or overload another proposed bioretention basin. ACOUSTICS Issue – Acoustic Assessment A number of aspects of the submitted Acoustic Assessment require clarification or additional detail. Information Required 39 Provide an amended Acoustic Assessment addressing the following: (a) Provide further information about the traffic noise model, including the extent of the model, ground absorption co-efficient, buildings included, grid spacing for noise contour plots. (b) Re-plotting of the traffic noise levels contours showing 60 dBA L10 (18 hour) scale and increments of 1 dB. (c) Provide further information to demonstrate that the proposed park cabin design may satisfy the MP4.4 noise criteria for a 6.0m high boundary acoustic barrier. (d) Provide information to demonstrate compliance for the whole pool area with the passive recreation noise criterion. (e) Conduct testing to determine a representative caravan outside-to-inside field transmission loss with natural ventilation, and then determine a suitable external façade corrected noise criterion based upon the recommended mobile accommodation noise criteria noted in Section 2.1.1 above. (f) Provide further information to demonstrate that the mobile accommodation will comply with the determined façade corrected noise criterion. (g) Provide an assessment of sleep disturbance due to road traffic for the park cabins and mobile accommodation areas, based upon the sleep disturbance criterion of Section 2.1.1 above. (h) Provide an assessment of the noise impact of commercial uses upon the tourist park accommodation during the day, evening and night periods. (i) Review and confirm the applicable noise criteria levels in Tables 5.3 and 5.4 of the acoustic report. (j) Provide a detailed description of the noise model used to assess the impact of the commercial uses, including source locations, buildings included, car wash roof, receptor locations. Page 8 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.