GENERAL NOTES
Roof Construction
Colorbond sheet metal to be fixed in
accordance with manufacturers specification.
All ridge capping, steps, hips valleys and
vent flashings to provide waterproofing system.
Provide reflective foil backed sarking to
underside of roof sheeting. Colorbond
guttering and PVC Downpipes to be
connected to Stormwater systems in
accordance with the local authority.
DP1 (x2) DP1 (x2) DP1 (x2) DP1 (x2)
DP1 (x2)
Roof water requirements and calculations 3.1 sqm
are provided as a guide. Ensure a 4.9 sqm 27.9 sqm
qualified plumber/ hydraulics consultant reviews DP1 / DPS (x2)
the downpipe layouts prior to construction. DP1 / DPS (x2)
2°
Downpipe & Gutters
Rainfall Intensity 20 year ARI : 253
14.1 sqm
Raking Gutter
Roof catchment area : As Shown
Effective area of eaves gutter :5875mm² DP1 / DPS (x2)
Slope: greater or equal : 1:500
Downpipe size : DP : 90mm
DP1 : 100mm
Approx. Location Of Solar Panels
Maximum catchment per downpipe : to owners / builders specification.
DP : 33m²
DP1 : 45m² 2°
1.5°
64
.0
1.5°
sqm
Number of downpipes : As shown
General Notes
54
.6
Icon Building Design has provided downpipe
sq
68
locations as a guide only.
m
.1
sq
Layout to be checked for compliance by m
qualified persons prior to ordering and
construction.
All slotted gutters and downpipes to be
installed to NCC and or AS3500 (relevant parts).
Materials used are to be compatible with all
components upstream and down stream.
Position of proposed building to
be verified by builder on site.
2°
Location of existing services to be 17.9 sqm 0.7 sqm
verified by builder prior to construction.
DP1 (x2) DP1 (x2)
Icon Building Design has provided downpipe
locations as a guide only.
Layout to be confirmed by qualified persons prior to
construction.
SITE PLAN - ROOF DRAINAGE
Scale : 1 : 100
*NOTE : Icon Building Design has provided downpipe locations as a guide only. Layout to be confirmed by qualified persons prior to construction.*
Revision Schedule Project Address : Sheet Name: Project Status: Project Number:
Number Description Date Issued by No. 38 Tristania Drive, Marcus Beach Roof Drainage WD REV B 20-003
1 PCD I 10/02/22 NZP
2 Prelim WD 16/02/22 NZP Client Name : Project Issue Date : Q.B.C.C Lisence No. Sheet Number:
Email: [email protected]
Website: www.iconbuildingdesign.com.au
3 WD REV A 03/03/22 NZP Marcus & Amanda 11/03/2022 126221 15
4 WD REV B 11/03/22 NZP
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.