Original source · versioned page text
20-003A_Wd_Rev_B
Attached to the e-mail Operational Works Application - DA Form 1 - Engineering Plans - Architectural Plans - Owners Consent - 38 Tristania Dr Marcus Beach - Driveway.
The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Smoke detectors
To comply with A.S. 3786 - smoke alarms.
Approved smoke detectors with mains
supplied power and battery backup.
Lighting Electrical Legend
80% of all fixed internal lighting to be Power
energy efficient by Fluorescent Light or
Compact Fluorescent Light (C.F.L.).
Symbol Description Est. Act.
Builder / owner to supply Icon Building
Switched socket outlet
Design with lighting mark up for drafting in
final version.
Double switched socket outlet
Please supply the author with sketch
layout as soon as possible. WP
Weather proof switched socket outlet
K Power isolating key switch
Filter
Pool
AC UNIT HWS
Single phase outlet
DW WM
Two phase outlet
Three phase outlet
DW
Fr.
P P
Distribution board (DB)
On
Ceiling
WP
Communication
SD
Symbol Description Est. Act.
A
Audio jack
Wood Fireplace -
P P
Audio visual panel
Model TBC
A/V
n
Data outlet (n) denotes quantity
SD P
WP
Data outlet for wireless access point
Lighting
2 Storey Ceiling IM Intercom Panel
Symbol Description Est. Act. Telephone outlet
One-way switch TV TV Outlet
WP
Two-way switch
Other
One-way switch with dimmer control
Symbol Description Est. Act.
100mm Eyeball light
A.C.H A/C Split system Head Unit
150mm Eyeball light
A.C.C A/C Condensor Unit
150mm Recessed downlight
Exhaust fan
Compact fluroescent light
External Wall Mounted Light
Electric Fan with Light
Fluroescent light point
Feature Up Lighting
Incandescent light point
Electric Fan
Internal Wall Mounted Light
Pool light Smoke detector
Sensor light Security system keypad
Track light Water pump
GROUND FLOOR ELECTRICAL
Scale : 1 : 125
Revision Schedule Project Address : Sheet Name: Project Status: Project Number:
Number Description Date Issued by No. 38 Tristania Drive, Marcus Beach G.F. Electrical Plan WD REV B 20-003
1 PCD I 10/02/22 NZP
2 Prelim WD 16/02/22 NZP Client Name : Project Issue Date : Q.B.C.C Lisence No. Sheet Number:
Email: [email protected]
Website: www.iconbuildingdesign.com.au
3 WD REV A 03/03/22 NZP Marcus & Amanda 11/03/2022 126221 16
4 WD REV B 11/03/22 NZP
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.