Skip to the record
The gold standard in government transparency.

Original source · versioned page text

20-003A_Wd_Rev_B

Attached to the e-mail Operational Works Application - DA Form 1 - Engineering Plans - Architectural Plans - Owners Consent - 38 Tristania Dr Marcus Beach - Driveway.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

    Hazards Identification & Risk Control                                                                                                                                                                                                                                GENERAL NOTES                                           GENERAL INFORMATION                                             GENERAL INFORMATION
    1. FALLS, SLIPS, TRIPS                                                                                                      5.. MANUAL TASKS                                                                                                                         The builder is responsible to check all                 Construction of this building to be in accordance with the
    a) WORKING AT HEIGHTS                                                                                                       Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by
                                                                                                                                                                                                                                                                         existing services prior to beginning any                following Australian governing bodies.                          Minimum Design Standards
    DURING CONSTRUCTION                                                                                                         mechanical lifting device. Where this is not practical, suppliers or fabricators should be required to limit the
    Wherever possible, components for this building should be prefabricated off-site or at ground                               component mass.                                                                                                                          construction.                                                                                                           Construction of this building to be in
    level to minimise the risk of workers falling more than two metres. However, construction of                                All material packaging, building and maintenance components should clearly show the total mass of packages
                                                                                                                                                                                                                                                                                                                                 ♦ National Construction Code (NCC)                              accordance with the following Australian
    this building will require workers to be working at heights where a fall in excess of two metres is                         and where practical all items should be stored on site in a way which minimises bending before lifting. Advice
    possible and injury is likely to result from such a fall. The builder should provide a suitable                             should be provided on safe lifting methods in all areas where lifting may occur.                                                         # Denotes cavity slider to manufactuers                 ♦ Queensland Development Code                                   governing bodies.
    barrier wherever a person is required to work in a situation where falling more than two metres                             Construction, maintenance and demolition of this building will require the use of portable tools and equipment.                          specification, frames containing cavity sliders         ♦ Standard Building Regulation 2006                             ♦ National Construction Code (NCC)
    is a possibility.                                                                                                           These should be fully maintained in accordance with manufacturer’s specifications and not used where faulty or                                                                                                                                                   ♦ Queensland Development Code
    DURING OPERATION OR MAINTENANCE                                                                                             (in the case of electrical equipment) not carrying a current electrical safety tag. All safety guards or devices                         to be 90mm minimum U.N.O                                ♦ Local government planning policies
    Cleaning and maintenance of windows, walls, roof or other components of this building will                                  should be regularly checked and Personal Protective Equipment should be used in accordance with                                                                                                  ♦ Estate Design Guidelines                                      ♦ Standard Building Regulation 2006
    require persons to be situated where a fall from a height in excess of two metres is possible.                              manufacturer’s specification.                                                                                                                                                                                                                                    ♦ Local government planning policies
    Where this type of activity is required, scaffolding, ladders or trestles should be used in                                                                                                                                                                          Builder to verify all dimensions prior to
    accordance with relevant codes of practice, regulations or legislation.                                                     6. HAZARDOUS SUBSTANCES                                                                                                                  beginning construction work.                            Roof Construction                                               ♦ Estate Design Guidelines
    Cleaning and maintenance of windows, walls, roof or other components of this building will                                  ASBESTOS
    require persons to be situated where a fall from a height in excess of two metres is possible.                              (for alterations to a building constructed prior to 1990)                                                                                                                                        Colorbond sheet metal to be fixed in accordance with
    Where this type of activity is required, scaffolding, fall barriers or Personal Protective                                  This building was constructed prior to 1990 and therefore may contain asbestos either in cladding material or in                         Electric HWS to minimum energy efficiency               manufactures specification.                                     Site Plan Notes
    Equipment should be used in accordance with relevant codes of practice, regulations or                                      fire retardant insulation material. The builder should check and, if necessary, take appropriate action before
    legislation.                                                                                                                demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
                                                                                                                                                                                                                                                                         regulations.                                            All ridge capping, steps, hips valleys and vent flashings to    Surface water drainage must be prevented
    Anchorage points for portable scaffold or fall arrest devices have been included in the design                              (for alterations to a building constructed prior to 1986)                                                                                                                                        provide waterproofing system.                                   from entering the building with FGL sloping
    for use by maintenance workers. Any persons engaged to work on the building after completion                                This building was constructed prior to 1986 and therefore is likely to contain asbestos either in cladding material                      Toilets: minimum 4-star dual flush, as rated
    of construction work should be informed about the anchorage points.                                                         or in fire retardant insulation material. The builder should check and, if necessary, take appropriate action before                                                                                                                                             away from the building & finished slab levels.
                                                                                                                                demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.                                                  under the Water Efficiency and Labeling                 Provide reflective foil backed sarking to underside of roof     The builder is responsible to check all existing
    b) SLIPPERY OR UNEVEN SURFACES                                                                                              POWDERED MATERIALS                                                                                                                       Standards scheme (WELS).                                sheeting. Colorbond guttering and PVC Downpipes to be           services prior to beginning construction.
    FLOOR FINISHES                                                                                                              Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons
    Specified finishes have been selected to minimise the risk of floors and paved areas becoming                               working on or in the building during construction, operational maintenance or demolition should ensure good                                                                                      connected to Stormwater systems in accordance with the
    slippery when wet or when walked on with wet shoes/feet. Any changes to the specified finish                                ventilation and wear Personal Protective Equipment including protection against inhalation while using powdered                          Tapware: minimum 3-star WELS rated for                  local authority.                                                Stabilised cut and fill batters to be a
    should be made in consultation with the designer or, if this is not practical, surfaces with an                             material or when sanding, drilling, cutting or otherwise disturbing or creating powdered material.
    equivalent or better slip resistance should be chosen.                                                                                                                                                                                                               kitchen sinks, basins and laundry troughs.                                                                              minimum of 1000mm away from footings
    The owner is responsible for the selection of surface finishes in the pedestrian trafficable areas                                                                                                                                                                                                                           Roof water requirements and calculations are provided as a      and are to have 1 in 1 max. gradient.
    of this building. Surfaces should be selected in accordance with AS HB 197:1999 and AS/NZ                                   TREATED TIMBER
    4586:2004.                                                                                                                  The design of this building includes provision for the inclusion of treated timber within the structure. Dust or
                                                                                                                                                                                                                                                                         Showerheads: minimum 3-star WELS rated                  guide. Ensure a qualified plumber/ hydraulics consultant        Grade finished surface level
                                                                                                                                fumes from this material can be harmful. Persons working on or in the building during construction, operational                          showerheads.                                            reviews the downpipe layouts prior to construction.             from slab and footings.
    c) STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                                                                 maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including
    Due to design restrictions for this building, steps and/or ramps are included in the building                               protection against inhalation of harmful material when sanding, drilling, cutting or using treated timber in any way
    which may be a hazard to workers carrying objects or otherwise occupied. Steps should be                                    that may cause harmful material to be released. Do not burn treated timber.                                                             SD Smoke alarms complying with AS 3786                   Icon Building Design has provided downpipe locations as a       Position of proposed building to
    clearly marked with both visual and tactile warning during construction, maintenance,                                       VOLATILE ORGANIC COMPOUNDS                                                                                                               to be installed and connected to consumer               guide only. Layout to be checked for compliance by qualified    be verified by builder on site.
    demolition and at all times when the building operates as a workplace.                                                      Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants have
    Building owners and occupiers should monitor the pedestrian access ways and in particular                                   dangerous emissions. Areas where these are used should be kept well ventilated while the material is being used                          mains power in accordance with NCC part                 persons prior to ordering and construction.                     Location of existing services to be
    access to areas where maintenance is routinely carried out to ensure that surfaces have not                                 and for a period after installation. Personal Protective Equipment may also be required. The manufacturer’s                              3.7.2                                                   All slotted gutters and downpipes to be installed to NCC and    verified by builder prior to construction.
    moved or cracked so that they become uneven and present a trip hazard. Spills, loose material,                              recommendations for use must be carefully considered at all times.
    stray objects or any other matter that may cause a slip or trip hazard should be cleaned or                                 SYNTHETIC MINERAL FIBRE                                                                                                                                                                          or AS3500 (relevant parts). Materials used are to be
    removed from access ways.                                                                                                   Fibreglass, rockwool, ceramic and other material used for thermal or sound insulation may contain synthetic                              All electrical appliances and plumbing symbols          compatible with all components upstream and down stream.        Wall Construction
    Contractors should be required to maintain a tidy work site during construction, maintenance or                             mineral fibre which may be harmful if inhaled or if it comes in contact with the skin, eyes or other sensitive parts
    demolition to reduce the risk of trips and falls in the workplace. Materials for construction or                            or the body. Personal Protective Equipment including protection against inhalation of harmful material should be
                                                                                                                                                                                                                                                                         are diagrammatical. Refer to builders                                                                                   Wall framing to be constructed in
    maintenance should be stored in designated areas away from access ways and work areas.                                      used when installing, removing or working near bulk insulation material.                                                                 specification for details all fixtures.                 Surface water drainage must be prevented from entering the      accordance with engineering specification
                                                                                                                                TIMBER FLOORS                                                                                                                                                                                    building with FGL sloping away from the building & finished
    2. FALLING OBJECTS                                                                                                          This building contains timber floors which have an applied finish. Areas where finishes are applied should be kept                                                                                                                                               and must not differ from certification
    LOOSE MATERIALS OR SMALL OBJECTS                                                                                            well ventilated during sanding and application and for a period after installation. Personal Protective Equipment                        Seal wet areas in accordance with N.C.C. Vol. 2.        slab levels. The builder is responsible to check all existing   covered by the Form 15. Cladding
    Construction, maintenance or demolition work on or around this building is likely to involve                                may also be required. The manufacturer’s recommendations for use must be carefully considered at all times.                              Part 3.8.1. Slope floor surface towards fw              services prior to beginning construction.                       systems to be fixed in accordance with
    persons working above ground level or above floor levels. Where this occurs one or more of the
    following measures should be taken to avoid objects falling from the area where the work is                                                                                                                                                                          (floor wastes)                                                                                                          manufactures specification.
    being carried out onto persons below.                                                                                       7. CONFINED SPACES                                                                                                                       Provide lighting in accordance with N.C.C. Vol. 2.      Position of proposed building to be verified by builder on
    1.            Prevent or restrict access to areas below where the work is being carried out.                                EXCAVATION
    2.            Provide toeboards to scaffolding or work platforms.                                                           Construction of this building and some maintenance on the building will require excavation and installation of                           Part 3.8.4.2 & 3                                        site. Location of existing services to be                       Wet Areas
    3.            Provide protective structure below the work area.                                                             items within excavations. Where practical, installation should be carried out using methods which do not require                         Provide ventilation in accordance with N.C.C.           verified by builder prior to construction.                      Floors in "Wet Areas" to be impervious in
    4.            Ensure that all persons below the work area have Personal Protective Equipment.                               workers to enter the excavation. Where this is not practical, adequate support for the excavated area should be
    BUILDING COMPONENTS                                                                                                         provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorised access to all
                                                                                                                                                                                                                                                                         Vol. 2. Part 3.8.5                                                                                                      accordance with Australian Standards.
    During construction, renovation or demolition of this building, parts of the structure including                            excavations should be provided.                                                                                                          Mechanical ventilation in accordance with N.C.C         Termite method to be in accordance with the NCC Part 3.1.3      Finish and fall gradients to floor wastes.
    fabricated steelwork, heavy panels and many other components will remain standing prior to or                                                                                                                                                                        Vol. 2. and AS1668.2                                    and other relevant manufacturer specification. All new work
    after supporting parts are in place. Contractors should ensure that temporary bracing or other
    required support is in place at all times when collapse which may injure persons in the area is a                           ENCLOSED SPACES                                                                                                                                                                                  shall be protected from termite attack in accordance with AS    Glazing Construction
    possibility.
                                                                                                                                                                                                                                                                         Climate Code Requirements                               3600.1 "Protection of the Building from Subterranean            Powdercoated Aluminum Frame
    Mechanical lifting of materials and components during construction, maintenance or demolition                               Enclosed spaces within this building may present a risk to persons entering for construction, maintenance or any
    presents a risk of falling objects. Contractors should ensure that appropriate lifting devices are                          other purpose. The design documentation calls for warning signs and barriers to unauthorised access. These                               Energy efficiency assessor to confirm                   Termites AS2870 Part 1 New Building Slabs.                      Windows in accordance with AS 4055
    used, that loads are properly secured and that access to areas below the load is prevented or                               should be maintained throughout the life of the building. Where workers are required to enter enclosed spaces,
    restricted.                                                                                                                 air testing equipment and Personal Protective Equipment should be provided.                                                              adequacy of proposed construction.                                                                                      "wind loads for residential" & AS 1288
                                                                                                                                SMALL SPACES                                                                                                                             Provide insulation to N.C.C. code requirements                                                                          "Glass in Buildings selection and
    3. TRAFFIC MANAGEMENT                                                                                                       Some small spaces within this building will require access by construction or maintenance workers. The design
                                                                                                                                                                                                                                                                         or to BERS certification requirements.                                                                                  installation"
                                                                                                                                documentation calls for warning signs and barriers to unauthorised access. These should be maintained
    (for building on a major road, narrow road or steeply sloping road)                                                         throughout the life of the building. Where workers are required to enter small spaces they should be scheduled
                                                                                                                                                                                                                                                                         Dimensions Note:                                                                                                        Soffit Construction
    Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic hazard.                            so that access is for short periods. Manual lifting and other manual activity should be restricted in small spaces.
    During construction, maintenance or demolition of this building designated parking for workers                                                                                                                                                                       All wall dimensions are taken from                                                                                      4.5mm F.C Sheeting and Painted
    and loading areas should be provided. Trained traffic management personnel should be                                        8. PUBLIC ACCESS
                                                                                                                                                                                                                                                                         the outside faces of the stud wall.                                                                                     (Raked)
    responsible for the supervision of these areas.                                                                             Public access to construction and demolition sites and to areas under maintenance causes risk to workers and
    (for building where on-site loading/unloading is restricted)                                                                public. Warning signs and secure barriers to unauthorised access should be provided. Where electrical                                    (i.e. selected cladding over omitted for
    Construction of this building will require loading and unloading of materials on the roadway.                               installations, excavations, plant or loose materials are present they should be secured when not fully supervised.
                                                                                                                                                                                                                                                                         clarity excluding brick veneer walls).                                                                                  Waterproofing & Water Resistant
    Deliveries should be well planned to avoid congestion of loading areas and trained traffic
    management personnel should be used to supervise loading/unloading areas.                                                   9. OPERATIONAL USE OF BUILDING
                                                                                                                                                                                                                                                                                                                                                                                                 Materials
    (for all buildings)                                                                                                                                                                                                                                                                                                                                                                          All wet area waterproofing is to
    Busy construction and demolition sites present a risk of collision where deliveries and other                               This building has been designed as a residential building. If it, at a later date, is used or intended to be used as a                                                                                                                                           comply with AS3740, waterproofing
    traffic are moving within the site. A traffic management plan supervised by trained traffic                                 workplace, the provisions of the Work Health and Safety Act 2011 or subsequent replacement Act should be
    management personnel should be adopted for the work site.                                                                   applied to the new use.                                                                                                                                                                                                                                          wet areas in residential buildings.
                                                                                                                                                                                                                                                                                                                                                                                                 NCC Vol2 P3.8.1.0
    4. SERVICES                                                                                                                 This building has been designed to requirements of the classification identified on the drawings. The specific use
    Rupture of services during excavation or other activity creates a variety of risks including                                of the building is not known at the time of the design and a further assessment of the workplace health and                                                                                                                                                      All waterproofing material systems
    release of hazardous material. Existing services are located on or around this site. Where                                  safety issues should be undertaken at the time of fit-out for the end-user.                                                                                                                                                                                      components to be installed to
    known, these are identified on the plans but the exact location and extent of services may vary
    from that indicated. Services should be located using an appropriate service (such as Dial                                  This building has been designed for the specific use as identified on the drawings. Where a change of use                                                                                                                                                        manufacturers specification.
    Before You Dig), appropriate excavation practice should be used and, where necessary,                                       occurs at a later date a further assessment of the workplace health and safety issues should be undertaken.                                                                                                                                                      Instructions and material capability to
    specialist contractors should be used.
    (in locations with underground power)                                                                                       10. OTHER HIGH RISK ACTIVITY
                                                                                                                                                                                                                                                                                                                                                                                                 be checked prior to construction.
    Underground power lines are located in or around this site. All underground power lines must                                All electrical work should be carried out in accordance with Code of Practice: Managing Electrical Risks at the
    be disconnected or carefully located and adequate warning signs used prior to any                                           Workplace, AS/NZ 3012 and all licensing requirements.
    construction, maintenance or demolition commencing.                                                                         All work using Plant should be carried out in accordance with Code of Practice: Managing Risks of Plant at the                                                                                                                                                   Termite Risk Management
    (in locations with overhead power lines )                                                                                   Workplace.                                                                                                                                                                                                                                                       Method to be in accordance with the
    Overhead power lines are near or on this site. These pose a risk of electrocution if struck or                              All work should be carried out in accordance with Code of Practice: Managing Noise and Preventing Hearing
    approached by lifting devices or other plant and persons working above ground level. Where                                  Loss at Work.                                                                                                                                                                                                                                                    NCC Part 3.1.3 and other relevant
    there is a danger of this occurring, power lines should be, where practical, disconnected or                                Due to the history of serious incidents it is recommended that particular care be exercised when undertaking                                                                                                                                                     manufacturer specification. All new
    relocated. Where this is not practical adequate warning in the form of bright coloured tape or                              work involving steel construction and concrete placement. All the above applies.
    signage should be used or a protective barrier provided.                                                                                                                                                                                                                                                                                                                                     work shall be protected from termite
                                                                                                                                                                                                                                                                                                                                                                                                 attack in accordance with AS 3600.1
                                                                                                                                                                                                                                                                                                                                                                                                 "Protection of the Building from
                                                                                                                                                                                                                                                                                                                                                                                                 Subterranean Termites AS2870 Part
                                                                                                                                                                                                                                                                                                                                                                                                 1 New Building Slabs.
                                                                                          Revision Schedule                                  Project Address :                                                                   Sheet Name:                                                               Project Status:                   Project Number:
                                                                                      Number Description           Date    Issued by         No. 38 Tristania Drive, Marcus Beach                                                General Notes                                                             WD REV B                          20-003
                                                                                      1     PCD I               10/02/22   NZP
                                                                                      2     Prelim WD           16/02/22   NZP               Client Name :                                                                       Project Issue Date :                                                      Q.B.C.C Lisence No.               Sheet Number:
Email: [email protected]
Website: www.iconbuildingdesign.com.au
                                                                                      3     WD REV A            03/03/22   NZP               Marcus & Amanda                                                                     11/03/2022                                                                126221                            01
                                                                                      4     WD REV B            11/03/22   NZP
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.
Log in to download the original file

20-003A_WD_REV_B.pdf · 12.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.