4 ~ $12 horizontaj bars, 250 4 - Si2 horizontal bars,
continuous, equally spaced in edge 250 continuous, equally
thickening. spoced in edge
Water fine. thickening. S12 @ 250 vert &
YO ted a horiz. u.n.o,
Water Sine.
(placed centre)
—
-
160 Min. 160 Min.
$12 @ 250 vert &
horiz. u.n.o. 160 Min.
$12 @ 250 vert
(placed centre) 8) we & horiz. u.n.o.
woe ee ee ee {900 Max. woil ht.) {placed centre)
Notural Strota
Fall
24
2 @
7 -
:
Natural Strata, vee
TYPICAL SECTION — SHALLOW END LF _DETAI
Hydrostatic pressure relief valve to “ny
current Australian Standard. Sealed
ond bonded to pool floor in
accordence with the moufacturers Additional S12 - 250 vert placed
specification. between other veris, extend past
Increase pool wall $12 @ 100. centres. Foil. fot radius os shown.{ie. $12~125) GENERAL NOTES :
= Pool to be constructed in accordance with AS 2783 ond
thickness to 200mm sees 100mm thick compacted 10mm councd safely requements.
where supporting Ls 150 Min. \ e-wl 150 Min. ee to 20mm clean crushed rock ~ Concrete Strength Fo = 32MPa at 28 days (effective
blockwork walls.
filter media. cement content to be not tess than 280kg per m3) for pools
Skimmer box in Continue S12 @ 150 centres around
accordance with valve in both girections ~ within km of lorge expanses of salt woter such as the seo
AS1926 fap= 500mm (but pool not to be constructed in tidal splash zones of salt
Existing timber retaining wall | Locate skimmer box 500mm x 500mm pit filled with TYPICAL SECTION — DEEP END woter). Where pools are constructed more than 1km from
so flap faces large expanses of salt water (such os the sea) the concrete
prevating wind. 10mm to 20mm crushed rock {no strength moy be reduced to 25MPa.
tines) fiéter material. — Admixtures io comply with AS1478
Wrap in geolextile membrane. - Concrete slump 80mm.
- Concrete to be sprayed in a continuous operation ond cured
POOL for 7 days minimurn. This involves keeping the walls ond floor
160. kin. surface moist in an approved manner (ie. fog spray)
aa Where radius less than Alternatively the surface can be sprayed with confim or
equally approved additive.
500mm provide — Rod concrete in walls to remove all air pockets (only
Additional $12-200 vibrate in tight corners).
$12 @ 100mm centres Horizontals, Between - Do not use curing compounds which affect the bonding of
around skimmer box. main bars. 600 Max applied coatings.
~ Reinforcement — Alf steel to be grade 250 S bars.
Reinforcement — minimum cover 70mm +5/~Omm
To Fitter ~ Reinforcement laps 500mm for S bars.
= All reinforcement bors to be continuous around all corners
oe ee ne ee SECTION ond curves ond shall be lapped U.N.O.
POOL PLAN ) AILS VERTICAL CORNER DETAIL. Minimum stripping and/ or backfilling time is 14 days.
- The final pool shape and layout should be approved by the
engineer prior to commencement of works.
— All fences ond gates surrounding pool area shall be in
accordance with AS1926.
- The pool excavation shall in no way undermine any adjacent
fi,@ acl #4, Gp structures or services (Refer to critical line diagram provided).
Approved joint “ % The pool contractor /builder is responsible for obtaining all
sealing tape over relevant levels and positions of adjacent structures prior to
Sikaflex capping. oe oe RY commencing work.
Ground / Hydrotite waterstop Abelflex between &
pad te This footing The builder /conteactor strips both sides of Kydrotite strips. ¥
Unstable without piers sholl confirm all relevant ond full tength of Si2 @ 250 vert &
{ is founded | levels prior to joint, horiz. u.n.o. “4 of GER
above critical
This footing is Stable | commencing works. (placed centre} ‘s CONSULTING ENGINEERS
depth fine and
founded below is unstoble. structural | - geotechnical
aa
Q = GM
critical line and is | th ABN 40 098 481 899
stable. . :
ne
Piers supporting so] 1.73 | Line of proposed bees 250 Min & 18 DUKE STREET SUNSHINE BEACH QLD.4567
N35 Pool Excavation or Ph (07) 5447 5544 Fax (07) 5447 2634
footings or pest pad other trench. Ri6x400{L) Dowels (Golv) —! ae
footings founded into @ 600ctrs with one end Hydrocast EX’
selected material and below lorizonial 30 Deg greased and fitted with an waterstop to wail and Ane ee an
critical fine are considered floor Min,
end cap.
stable.
CRITICAL DEPTH LINE CONTROL JOINT DETAIL STAIR DETAILSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156930.001.pdfRelated documentPublic source context ↗
07/0386 - Op Works - Landscaping, Carparking & Access, Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.