Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25 · MCU22/0094

of 101

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (21.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 69, section 1. The text section number identifies this passage in the reader.

6.6.2 Implementation Strategy

Establish control measures and best practice approaches to prevent stormwater contamination and
minimise the risk and adverse effects of erosion and sedimentation. All Erosion and Sediment Control
measures must be designed, constructed and maintained in a manner that is commensurate with the
site’s erosion risk.

6.6.3 Erosion and Sediment Control Measures
•    Obtain a licence or approval to operate activities that are classed as environmentally relevant
     activities (i.e. they have the potential to cause environmental harm).
•    Implement and maintain appropriate control measures to prevent sediment leaden wastewater and
     other potential pollutants such as oil, paint and wet concrete from entering the stormwater system
     via stormwater drains and gullies. The control measures which must be considered to be adopted
     are:
     –    Limit site access during construction to minimise disruption to traffic
     –    Install a temporary construction entry/exit sediment trap at all site accesses to minimise mud
          and sediment from the site being tracked onto public road, particularly during wet weather or
          when the site is muddy.
     –    Install and maintain appropriate sediment fences around construction areas
          ○     Divert clean stormwater runoff, using catch drains, around construction areas to existing or
                new stormwater drainage system.
          ○     Install sandbags and other pollution containment devices around stormwater drains and any
                other locations where required to prevent sediment entering the trunk stormwater system.
          ○     Cover open earth/soil areas progressively (with concrete slabs and pavements or mulch) to
                minimise areas of bare earth/soil.
          ○     Any stockpiles of excavated soil and demolition / construction waste must be located where
                risk of erosion and sediment is minimal, and must be protected from wind and water erosion.
     –    Implement and maintain appropriate control measures such as catch drains and sediment
          fences to prevent ponding of stormwater or discharge of stormwater from the site to adjacent
          properties.
     –    Provision of spill / pollution control equipment that is readily accessible to clean up spills and
          leaks.
     –    Ensure spill/pollution control measures are available and maintained in working condition.
     –    Sediment contained by the sediment control devices such as sandbags, sediment fences and
          containment bunds must be frequently removed and placed in a controlled area.
•    Implement an inspection schedule for any spill or leaks of any potential polluting areas or activities.




                                                                                                                                                           18
Inspired engineering

10 April 2025
                                                                                                                                             67
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/9000-9999/9300-9399/9307/Reports/10-04-25 Stormwater Management Plan_Issue G.docx

Used in these records

About this file

File size
21.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdf · 21.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.