Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25 · MCU22/0094

of 101

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (21.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 70, section 1. The text section number identifies this passage in the reader.

6.6.4 Erosion Sediment Control Management Goals
•    Licenses, approvals, permits and inspection reports are in order.
•    Sediment or pollution control devices such as sandbags, sediment fences and containment bunds
     are in place, maintained and effective.
•    Spill/ pollution control equipment is readily accessible at designated locations.
•    No accumulated sediment is contained by the sediment control devices such as hay bales, sediment
     fences and containment bunds.
•    No sediment exceeding a depth of 300mm in the pollution control devices (e.g. silt trap).

6.6.5 Erosion and Sediment Control Implementation Program
•    Licenses, permits or approvals for each environmentally relevant activity must be obtained prior to
     the commencement of the particular activity.
•    Appropriate control measures such as sediment fences, temporary construction entry/ exit sediment
     traps, pollution containment devices (e.g. sandbags), stormwater diversion and administrative
     controls must be installed and established prior to commencement of the earthworks and
     construction activities.
•    Pollution control devices such as spill control equipment must be inspected on a regular basis (at
     least weekly).
•    Other sediment and pollution control equipment such as containment bunds, hay bales and
     sediment fences must be inspected on a regular basis (at least daily).
•    Inspection for any leaks, spills or potential contaminating activity must be performed on a regular
     basis (at least daily).
•    Remove accumulated sediment or other contaminants from sediment/ pollution control devices on
     a regular basis.
•    All erosion and sediment control measures must be inspected within 24 hours of expected rain and
     within 18 hours of a rainfall event.

6.6.6 Responsible Person or Organisation

The contractor shall be responsible for the implementation and maintenance of the Erosion and
Sediment Control Measures.

6.6.7 Reporting / Review

Records such as licences, approvals, permits and inspection reports must be reviewed on a regular basis
(e.g. at least monthly) to ensure that legal compliance is met, complaints are reviewed and systems are
working to prevent contamination.




                                                                                                                                                           19
Inspired engineering

10 April 2025
                                                                                                                                             68
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/9000-9999/9300-9399/9307/Reports/10-04-25 Stormwater Management Plan_Issue G.docx

Used in these records

About this file

File size
21.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdf · 21.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.