6.6.4 Erosion Sediment Control Management Goals
• Licenses, approvals, permits and inspection reports are in order.
• Sediment or pollution control devices such as sandbags, sediment fences and containment bunds
are in place, maintained and effective.
• Spill/ pollution control equipment is readily accessible at designated locations.
• No accumulated sediment is contained by the sediment control devices such as hay bales, sediment
fences and containment bunds.
• No sediment exceeding a depth of 300mm in the pollution control devices (e.g. silt trap).
6.6.5 Erosion and Sediment Control Implementation Program
• Licenses, permits or approvals for each environmentally relevant activity must be obtained prior to
the commencement of the particular activity.
• Appropriate control measures such as sediment fences, temporary construction entry/ exit sediment
traps, pollution containment devices (e.g. sandbags), stormwater diversion and administrative
controls must be installed and established prior to commencement of the earthworks and
construction activities.
• Pollution control devices such as spill control equipment must be inspected on a regular basis (at
least weekly).
• Other sediment and pollution control equipment such as containment bunds, hay bales and
sediment fences must be inspected on a regular basis (at least daily).
• Inspection for any leaks, spills or potential contaminating activity must be performed on a regular
basis (at least daily).
• Remove accumulated sediment or other contaminants from sediment/ pollution control devices on
a regular basis.
• All erosion and sediment control measures must be inspected within 24 hours of expected rain and
within 18 hours of a rainfall event.
6.6.6 Responsible Person or Organisation
The contractor shall be responsible for the implementation and maintenance of the Erosion and
Sediment Control Measures.
6.6.7 Reporting / Review
Records such as licences, approvals, permits and inspection reports must be reviewed on a regular basis
(e.g. at least monthly) to ensure that legal compliance is met, complaints are reviewed and systems are
working to prevent contamination.
19
Inspired engineering
10 April 2025
68
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/9000-9999/9300-9399/9307/Reports/10-04-25 Stormwater Management Plan_Issue G.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.