Council archive · source document
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25 · MCU22/0094
Very large file (21.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 95, section 1. The text section number identifies this passage in the reader.
For the Jellyfish® system a major service is a reactionary process based on the outcomes from the minor service. Rinsing does not remove accumulated Replace Jellyfish® sediment from the tentacles tentacles! io h® Jellyfish® tentacles are damaged Bees E ey tentacles! Jellyfish® cartridges have been in operation for 5 years Replace Jellyfish® tentacles! i Replacement filter tentacles and components are available for purchase from Ocean Protect This service is designed to return the Jellyfish® device back to optimal operating performance. Establish a safe working area around the access point Remove access covers Using a vacuum unit or net remove any floatable gross pollutants contained behind the maintenance access wall Using a vacuum unit decant the water until the level drops below the base of the cartridges S oo8 Remove Jellyfish® cartridges* o a. Remove cartridge lid b. Remove cartridges vertically from chamber, lifting from eye nut lifting points only c. Replace and secure cartridge lid back into deck to reduce trip hazards during maintenance Unscrew all 11 tentacles from the cartridge head plate for disposal, keep all components for fixing of new tentacles to existing head plate* Wash down deck level to remove any built up sediment (if required) o oo Use vacuum unit to remove accumulated sediment and pollutants in the chamber Install replacement tentacles into each head plate* 8G 8 Install Jellyfish® cartridges a. Remove cartridge lid b. Lower cartridge into chamber, lifting from eye nut lifting points only c. Insert cartridge vertically into cartridge receptacle, and secure cartridge lid back in place a Replace access covers © OCEAN PROTECT The standard maintenance approach is designed to work towards keeping the Jellyfish® system operational during normal conditions. From time to time, events on site can make it necessary to perform additional maintenance to ensure the continuing performance of the device. Hazardous Material Spill If there is a spill event on site, the Jellyfish® unit should be inspected and serviced accordingly. Specifically, all captured pollutants and liquids from within the unit should be removed and disposed in accordance with any additional requirements that may relate to the type of spill event. Additionally, it will be necessary to inspect the filter cartridges and assess their contamination, depending on the type of spill event it may be necessary to replace the filtration cartridges. Blockages The Jellyfish® treatment system is designed to operate in an offline arrangement, where an upstream high flow bypass structure is in used. In the unlikely event that flooding occurs upstream of the Jellyfish® system, the following steps should be undertaken to assist in diagnosing the issue and determining the appropriate response. a Inspect the upstream diversion structure to ensure that it is free of debris and pollutants Inspect the Jellyfish® unit checking both the inlet and outlet pipes for obstructions (e.g. pollutant build-up, blockage), which if present, should be removed Major Storms and Flooding In addition to the scheduled activities, it is important to inspect the condition of the Jellyfish® after a major storm event. The focus is to inspect for damage and higher than normal sediment accumulation that may result from localised erosion. Where necessary, damaged components should be replaced and accumulated pollutants should be removed and disposed. “Refer Appendix 1 for Jellyfish® Cartridge Schematic ~“ 93
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgment - Stockwell v Noosa Council - PEC Appeal 1998 of 2024 - 26.06.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.