27. A waste storage area must be provided within proposed Lot 1 as shown on Part Site Plan –
Refuse Collection (165-DA-068-D) dated 23 June 2025 to facilitate limited Refuse Collection
Vehicle (RCV) access onto the site in accordance with an Operational Works approval and
The Noosa Plan 2020 Planning Scheme Policy PSP9 Waste Management. The waste
storage area must be at least 2m wide, divided into two sections, be at a grade no steeper
than 1:15, and designed so that it is imperviously paved and screened from public places
and neighboring properties.
28. The part of the driveway shown on Part Site Plan – Refuse Collection (165-DA-068-D) dated
23 June 2025 must be no steeper than:
a. for the area shown in a purple colour - the 1:6 grade as depicted; and
b. for the area shown in a light blue colour – the 1:10 grade as depicted.
29. A bin wash area as shown on Part Site Plan – Refuse Collection (165-DA-068-D) dated 23
June 2025 is required with a cold-water tap, hose and drain outlet connected to sewer, via a
bucket trap. The drain outlet must be designed:
a. to prevent stormwater entry to Council’s sewerage system;
b. so that it is bunded and graded with a maximum nib wall height of 100 mm enclosing
a minimum wash area of 700 mm x 700 mm (maximum of 0.7 m2) or otherwise roofed
or covered as approved by the Chief Executive Officer.
30. A gate system must be utilised on site with a keypad format with codes provided to Council
to permit the driver of the RCV to activate (without leaving the vehicle) Gate A opening to
allow entry to the site, Gate A and Gate B closing while the collection service is taking place
and Gate A and Gate B re-opening when the collection service is complete. Gate A, Gate B
and the gate activation keypads are to be located as shown on Part Site Plan – Refuse
Collection (165-DA-068-D) dated 23 June 2025.
Vegetation Clearing/Tree and Fauna Protection
31. Only those trees identified as being for removal in the Approved Plans, particularly the Impact
to Trees on Site (v3.0) dated 26 June 2025 may be removed from the site.
32. All trees identified as being for retention on the Approval Plans must be retained unless
otherwise approved by Council.
33. Trees outside the site boundary must not be removed unless otherwise approved by the
Chief Executive Officer in writing.
34. Tree protection measures (including vegetation protection fencing) must be in place prior to
any vegetation clearing/works on the site.
35. A Construction and Tree Protection Management Plan demonstrating no conflict between
tree protection and construction, must be prepared for approval by the Chief Executive
Officer in writing. The plan must be prepared by a suitably qualified person.
36. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) prepared by a qualified person* including provision for a fauna spotter
and endorsed through an Operational Works approval. The plan must identify fauna habitats
and features, detail the clearing procedure and include fauna trapping and relocation
measures to be implemented prior to clearing.
37. No vegetation clearing is to occur on the site without the presence of a qualified person
(Fauna Spotter Catcher)*.
*(Refer to Advisory Note)
38. Vegetation clearing and fauna spotter work in accordance with this approval is always to be
undertaken in accordance with best practise methods and guidelines.
39. A vegetation clearing/fauna report must be provided to Council after vegetation clearing.
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Sealed Judgement Neate 1219 of 2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 94.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.