Fencing and Walls
19. Any street fencing must not exceed 1.8 metres in height, be set back an average of 1 metre
and articulated to provide visual interest by stepping the design. Any fencing on the front
boundary must either:
a. not exceed a maximum height of 1.2 metres; or
b. be of open construction.
20. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street.
21. Any fencing along the eastern boundary of proposed Lot 2 must be of a fauna-friendly design.
Landscaping Works
22. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and the Noosa Plan for that specific area and must
include in particular:
a. detailed landscape plans undertaken by a suitably qualified landscape architect
generally in accordance with the Approved Plans;
b. vegetated screening of the built form when viewed from Attunga Heights road reserve,
designed such that the development will be softened and screened at maturity;
c. trees, shrubs, groundcovers and grasses must be selected from the preferred plant
species list within the Planning Scheme Policy 2 – Landscaping;
d. vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage; and
e. screen planting along the western and southern boundaries to protect the privacy of
adjoining properties and places in accordance with the Site Plan – Indicative
Construction Footprint and the Western Interface Setback and Path Separation
Analysis.
23. All landscape works must be established and maintained in accordance with the approved
landscape concept plan for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full form
and be refurbished when its life expectancy is reached.
24. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
25. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape;
b. installing protective fencing around the perimeter of the Construction Footprint (other
than at the access point from Attunga Heights) shown on the Approved Plans, prior to
the commencement of clearing or construction works and to be maintained for the
duration of clearing or construction works. To the extent that the tree protection zone
of trees identified as being for retention on the Approved Plans extends into the
Construction Footprint, any access or works within the tree protection zone must be
overseen by a level 5 arborist;
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared; and
d. using low impact construction techniques around vegetation.
Waste Management
26. The waste management arrangements for proposed Lot 2 must proceed byd way of ordinary
kerbside collection at Attunga Heights. The waste management arrangements for proposed
Lot 1 are addressed in Conditions 27 to 30.
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Sealed Judgement Neate 1219 of 2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 94.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.