b. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement;
c. all retaining walls and structures are fully contained within the lot they retain;
d. any fill, including fill batters, are wholly contained within the site and not on adjacent
properties; and
e. for the community title scheme, the road pavement changes required by this Approval
accurately demarcate the boundaries of the public and private land.
Easement
9. Grant an easement as shown on the Approved Plans, being the Lot Reconfiguration Plan,
over proposed Lot 1 in favour of proposed Lot 2 for the purpose of access including visitor
car parking.
10. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the site must be placed within an easement registered against the
title of the property.
11. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
Water & Sewer Connections
12. An underground connection to reticulated water and sewerage must be provided to each lot
in accordance with:
a. the Approved Plans, particularly the Report of Dr Trevor Johnson, as varied by
conditions 53 and 54 of the Material Change of Use approval; and
b. the standards and requirements of the Northern SEQ Distributor–Retailer Authority
(Unitywater).
13. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
must be submitted to Council that certifies an underground connection to reticulated water
and sewerage has been provided to each lot.
Services
14. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with an approval for Operational Works and the standards and requirements of
the relevant service provider.
15. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
16. Certification must be submitted to Council from all relevant service providers (Energex, NBN)
which certifies that the development has met the requirements of this Approval and all
applicable legislation at the time of construction.
Community Management Statement
17. A Community Management Statement under the Body Corporate and Community
Management Act 1997 must be registered over proposed Lot 1.
18. The Community Management Statement must be submitted to Council for endorsement at
the same time as submission of the subdivision plan to Council for compliance assessment.
19. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Approval and, in particular, must include the following additional
clauses:
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Sealed Judgement Neate 1219 of 2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 94.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.