Decision Notice MCU23 0134 & OPW23 0159 · MCU23/0134
Plan No. Rev. Plan/Document Name Date
TJS-04841-01 E Site Plan and Water Allocation 20 November 2023
prepared by EDGE Consulting
Engineers
TJS-04841-02 E Layout Plan prepared by EDGE 20 November 2023
Consulting Engineers
TJS-04841-03 C Elevation prepared by EDGE 15 November 2023
Consulting Engineers
TJS-04841-04 A Decking Details prepared by EDGE 19 June 2023
Consulting Engineers
TJS-04841-05 A Foam Details; Ally Flat Deck Type 19 June 2023
prepared by EDGE Consulting
Engineers
TJS-04841-07 A Layout Plan with Nearmap Overlay 3 November 2023
prepared by EDGE Consulting
Engineers
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with by 19 January 2026, unless an application to extend the currency period is
approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
General Conditions
4. The maximum number of vessels that may be berthed, moored, attached or stored on the
structure must not exceed 2.
5. The use of the pontoon must not cause any adverse effects on the amenity of the surrounding
areas including changes to light, views, air quality and noise.
6. Vessels berthed/moored at the pontoon must be located a minimum of 3.0 metres from the
prolongation of the property boundaries.
7. Vessels and boatlifting devices must be connected directly to the pontoon, and not located
side by side or in tandem with another vessel.
8. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall.
9. All structures must have no detrimental effects on stormwater drains and/or easements.
10. Rigid handrails must be fitted on the gangway. The handrails must be of an open design and
in accordance with the approved plans.
11. No boatlifting devices are to be attached or moored at the pontoon structure for the purpose
of elevating a vessel above the water without Council approval.
Page 2 of 7
Document Set ID: 22774277
Version: 2, Version Date: 19/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice MCU23 0134 & OPW23 0159.pdfRelated documentApplication case desk ↗
About this file
- File size
- 168 KB (small file)
- File type
No other editions are linked here.