               12.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
                      beyond the revetment wall unless all switches and power outlets are positioned above the
                      1%AEP flood level.
               13.    Lighting associated with the use must be designed, installed, operated, and maintained in
                      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
               14.    The pontoon is to be used for private purposes only with no commercial operations to be
                      undertaken.
               15.    Boat repair activities are not permitted on site.
               16.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
               17.    The mooring facility must not be utilised for live-aboard purposes.
               18.    Any construction and post construction activity is not to impact on the condition of the
                      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
                      (1994) and the Environmental Protection (Water) Policy 2009.
               19.    Certification by a Registered Professional Engineer of Queensland that states that the
                      gangway, pontoon and mooring pile are constructed in accordance with best practice
                      methods and are structurally sound must be submitted to Council. This certification must be
                      submitted to Council within three (3) months of the completion of the works. A final inspection
                      and approval of the structure by Council’s Inspector is also required. Please contact Council’s
                      Development Assessment Branch on 5329 6500 to arrange the inspection.
               20.    This approval lapses where the construction of the jetty has not commenced within two (2)
                      years of the date of issue of the approval, unless application is made and approved by
                      Council for an extension.
               21.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans.
               5.     REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                Referral Status        Referral Agency and Referral Trigger                 Response
                                       Address

                Concurrence            Department of State      Schedule 10, Part 17,       The agency provided its
                                       Development,             Division 1 – Tidal Works    response on 13
                                       Manufacturing,           or                          November 2023
                                       Infrastructure, and                                  (Reference No. 2311-
                                                                work in a Coastal
                                       Planning (SARA)                                      37725 SRA).
                                                                Management District
                                       SARA – SEQ North                                     A subsequent GIA
                                       Region Office                                        response was provided
                                       (07) 5352 9701 or                                    on 15 December 2023.
                                       email:                                               Copies of the
                                       SEQNorthSARA@dilgp                                   responses are attached
                                       .qld.gov.au

               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).




                                                                                                        Page 3 of 7
Document Set ID: 22774277
Version: 2, Version Date: 19/01/2024

Used in these records

About this file

File size
168 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice MCU23 0134 & OPW23 0159.pdf · 168 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.