Decision Notice MCU23 0134 & OPW23 0159 · MCU23/0134
12. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above the
1%AEP flood level.
13. Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
14. The pontoon is to be used for private purposes only with no commercial operations to be
undertaken.
15. Boat repair activities are not permitted on site.
16. Wastewater and sullage must only be disposed of at approved pumpout facilities.
17. The mooring facility must not be utilised for live-aboard purposes.
18. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
19. Certification by a Registered Professional Engineer of Queensland that states that the
gangway, pontoon and mooring pile are constructed in accordance with best practice
methods and are structurally sound must be submitted to Council. This certification must be
submitted to Council within three (3) months of the completion of the works. A final inspection
and approval of the structure by Council’s Inspector is also required. Please contact Council’s
Development Assessment Branch on 5329 6500 to arrange the inspection.
20. This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by
Council for an extension.
21. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans.
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence Department of State Schedule 10, Part 17, The agency provided its
Development, Division 1 – Tidal Works response on 13
Manufacturing, or November 2023
Infrastructure, and (Reference No. 2311-
work in a Coastal
Planning (SARA) 37725 SRA).
Management District
SARA – SEQ North A subsequent GIA
Region Office response was provided
(07) 5352 9701 or on 15 December 2023.
email: Copies of the
SEQNorthSARA@dilgp responses are attached
.qld.gov.au
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
Page 3 of 7
Document Set ID: 22774277
Version: 2, Version Date: 19/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice MCU23 0134 & OPW23 0159.pdfRelated documentApplication case desk ↗
About this file
- File size
- 168 KB (small file)
- File type
No other editions are linked here.