1856-S01_S18
10
JOINS PLAN 1856-S11
5
PROVIDE LAUNCH PIT ON THIS SIDE OF
WALTER HAY DRIVE & DRIVE ACCROSS
TO EASEMENT ON NOOSA CIVIC SIDE
FH
LOT 23
2.61Ha
ATTENTION: UNITYWATER PRIVATE WORKS
21
UNITYWATER TO SUPERVISE CONTRACTORS LIVE PROVIDE DIRECTIONAL DRILLING
SDR
WORKS CONNECTION TO EXISTING SEWER IN THE FOR FUTURE LOT 23 SEWER RISING
FOLLOWING STEPS: MAIN. REFER TO PLAN 1856-S17
ER PE100
1. REMOVE EXISTING POO PIT
2. PROVIDE NEW SMART STREAM POO WITH
PIPE
JUNCTION
0
ENV OD25
3. PROVIDE END PLUG TILL ON MAINTENANCE
INSPECTION.
OLP
4. REMOVE AFTER SUCCESSFUL ON
NEW
MAINTENANCE INSPECTION.
EXISTING NOOSA CIVIC 11
SHOPPING PRECINCT 3 MANHOLE FOR NEW CROSS ROAD
50
LOT 23 DEVELOPMENT
W
DN1
AL
110
FH
TE
NEW
EX 11 1.4m R
IS FH
1 NE
HA
TIN W
DN
G 15 HB11 Y
0
RO 1 D
AD 0.8 RI
4m 10 VE
0
10
15
N
D
EW
LEGEND - NEW FEATURES
N
NEW DN225 uPVC SN8 SEWER 11
2
10
NEW DN150 uPVC SN8 SEWER FH
NEW OD250 SEWER RISING MAIN HCB MH STUB
CONDUIT TYPE A
O/S 5.60
1 FH SL 8.15
3 NEW SEWER MANHOLE IL 6.65
110
HB1
3 NEW SEWER HORIZONTAL BEND LOT 2
9422m2
NEW SAW CUT TO EXISTING ROAD
EX
& REINSTATEMENT TO COUNCIL
STANDARDS & REQUIREMENTS
IST
CONTRACTOR TO SAW CUT EXISTING
HOFMANN DRIVE TO PROVIDE NEW
ATTENTION: CONTRACTOR
ING
DN225 SEWER PIPE & REINSTATE TO
COUNCIL STANDARDS & REQUIREMENTS
MINIMUM CLEARANCES
RO
AD
1. STORMWATER SHALL ALWAYS PASS OVER
SEWER MAINS WITH 500mm VERTICAL
FH
CLEARANCE.
2. WATERMAINS SHALL ALWAYS PASS OVER
SEWER MAINS WITH 500mm VERTICAL
CLEARANCE. 10
3. ELECTRICAL SHALL ALWAYS PASS OVER SEWER
MAINS WITH 300mm VERTICAL CLEARANCE.
AD
IT IS THE CONTRACTORS RESPONSIBILITY TO G RO
MAINTAIN ACCEPTABLE VERTICAL & HORIZONTAL STIN
CLEARANCE AS OUTLINED IN THE SEQ CODE. EXI
JOINS PLAN 1856-S09
10
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED SUBDIVISION 1856
A 18-03-20 FOR APPROVAL MM CL AT NOOSA CIVIC, WALTER HAY DRIVE
DATUM AHD SHEET: 10 OF 20
0 5.0 10 15 20 25m
FOR STOCKWELL PTY LTD
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
SCALE 1:500 A3
DESIGN CHECK (RPEQ 19358) p 07 5443 8285 SEWER LAYOUT PLAN S10 A
CL
e [email protected] w www.barlowshelley.com.au
DATE 18-03-20
This drawing is not to be copied or amended without written permission from
Barlow Shelley Consulting Engineers a PO Box 899, Maroochydore,4558 ABN 89 215 591 077 SHEET 7 OF 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.