Original source · versioned page text
1856-S01_S18
JOINS PLAN 1856-S10
EX EXISTING NOOSA CIVIC 11
IS SHOPPING PRECINCT
TIN 4 MANHOLE FOR NEW CROSS ROAD
G
0
LOT 23 DEVELOPMENT
LOT 23
5
RO W
DN1
AD AL 2.61Ha
110
FH
TE
N EW
11 1.4m R
FH
NE
1 W
DN
HA
15 HB11 Y
0u
PV 3 D
C SN 0.8 RI
8 SE 4m 10 VE
0
WE
10
15
R
N
ATTENTION: UNITYWATER PRIVATE WORKS
D
EW
UNITYWATER TO SUPERVISE CONTRACTORS LIVE WORKS
N
CONNECTION TO EXISTING SEWER IN THE FOLLOWING STEPS:
1. REMOVE EXISTING POO PIT 11
2. PROVIDE NEW SMART STREAM POO WITH JUNCTION 2
10
3. PROVIDE END PLUG TILL ON MAINTENANCE INSPECTION. FH
4. REMOVE AFTER SUCCESSFUL ON MAINTENANCE INSPECTION. HCB MH STUB
TYPE A
O/S 5.60
FH SL 8.15
IL 6.65
CONTRACTOR TO SAW CUT EXISTING
110
HOFMANN DRIVE TO PROVIDE NEW
DN225 SEWER PIPE & REINSTATE TO
LOT 2
COUNCIL STANDARDS & REQUIREMENTS 9422m2
EXISTING NOOSA CIVIC
EX
SHOPPING PRECINCT
IS TIN
GR
OA
D
10
10
AD
LEGEND - NEW FEATURES G RO
ST IN
NEW DN225 uPVC SN8 SEWER EXI
NEW DN150 uPVC SN8 SEWER
NEW OD250 SEWER RISING MAIN
CONDUIT
1
3 NEW SEWER MANHOLE
HB1
10
3 NEW SEWER HORIZONTAL BEND
NEW SAW CUT TO EXISTING ROAD
& REINSTATEMENT TO COUNCIL
STANDARDS & REQUIREMENTS
ATTENTION: CONTRACTOR
5
MINIMUM CLEARANCES
DRIVE
1. STORMWATER SHALL ALWAYS PASS OVER
ROAD C
SEWER MAINS WITH 500mm VERTICAL
CLEARANCE.
2. WATERMAINS SHALL ALWAYS PASS OVER
R HAY
SEWER MAINS WITH 500mm VERTICAL
10
LOT 3
CLEARANCE.
3. ELECTRICAL SHALL ALWAYS PASS OVER SEWER 4.004Ha
MAINS WITH 300mm VERTICAL CLEARANCE. LOT 7
WALTE
IT IS THE CONTRACTORS RESPONSIBILITY TO
2.963Ha
MAINTAIN ACCEPTABLE VERTICAL & HORIZONTAL
CLEARANCE AS OUTLINED IN THE SEQ CODE. JOINS PLAN 1856-S08
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED SUBDIVISION 1856
A 18-03-20 FOR APPROVAL MM CL AT NOOSA CIVIC, WALTER HAY DRIVE
DATUM AHD SHEET: 9 OF 20
0 10 20 30 40 50m
FOR STOCKWELL PTY LTD
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
SCALE 1:1000 A3
DESIGN CHECK (RPEQ 19358) p 07 5443 8285 SEWER LAYOUT PLAN S09 A
CL
e [email protected] w www.barlowshelley.com.au
DATE 18-03-20
This drawing is not to be copied or amended without written permission from
Barlow Shelley Consulting Engineers a PO Box 899, Maroochydore,4558 ABN 89 215 591 077 SHEET 6 OF 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.